Storage (Duration 0.5h)

15 unique locations (92 components)

35 Arkwright Road, Astmoor, Runcorn, WA7 1NU. (2 components)
• On-site existing CHP generating unit
• The batteries are housed within racks and installed, together with converters, inside an existing building. The batteries will be installed in the racks off-site and then delivered to site ready for lay-down, connection to the sub-station, testing and commissioning.
Active • 2024-25 (T-4), 2022-23 (T-4)
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (29 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• New build transmission connected battery storage site
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.90 MW
Amersham Road Denham Buckinghamshire SL9 7AW (5 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Carnegie Road, Liverpool, L13 7HY. (5 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Hawthorne Road, Bootle, Merseyside, L20 5AG. (4 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• DSR Component providing load turn down at a data centre
• The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land Adjacent to Braintree Substation Braintree 400kV substation Braintree Road Cressing CM77 8DJ (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Inactive • 2022-23 (T-4)
Land Adjacent to Norwich Substation Mangreen Lane Stoke Holy Cross Norwich NR14 8PG (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Inactive • 2022-23 (T-4)
Land Adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Inactive • 2022-23 (T-4)
Land Adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Inactive • 2022-23 (T-4)
Land to the West of Harker Grid Sub Station Low Harker Harker Carlisle CA6 4DQ (1 component)

New build transmission connected battery storage site

Inactive • 2022-23 (T-4)
Millbrook Power Station, Rookery South Pit, Green Lane, Stewartby, Bedfordshire MK43 9LX (6 components)
• A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
• A new power plant, with associated civil works, switchgear and electrical connection.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
284.35 MW
ROSSIDE FARM ROSSIDE ULVERSTON LA12 7SE (2 components)

NEW BUILD BATTERY STORAGE STATION

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Stanstead Abbots Ware Hertfordshire SG12 8JY (2 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Thames Water Sewage Treatment Works Ducklington Lane Witney OX28 5JH (2 components)
• A new power plant, with associated civil works, switchgear and electrical connection.
• Component has yet to be procured.
Inactive • 2022-23 (T-4), 2022-23 (T-3)
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (30 components)
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2330.50 MW
Loading map...
Showing 15 locations