Storage (Duration 0.5h)

2 unique locations (6 components)

35 Arkwright Road, Astmoor, Runcorn, WA7 1NU. (2 components)
• On-site existing CHP generating unit
• The batteries are housed within racks and installed, together with converters, inside an existing building. The batteries will be installed in the racks off-site and then delivered to site ready for lay-down, connection to the sub-station, testing and commissioning.
Active • 2024-25 (T-4), 2022-23 (T-4)
Hawthorne Road, Bootle, Merseyside, L20 5AG. (4 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• DSR Component providing load turn down at a data centre
• The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 2 locations