Storage (Duration 0.5h)

11 unique locations (47 components)

Active MW: 7408.38 MW
Inactive MW: 379.03 MW
Woodend Farm, Bigrigg, Cumbria, CA22 2TA (4 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Storage Storage (Duration 0.5h) CLEATOR BATTERY STORAGE LIMITED New Build Generating CMU Cleator Storage Cleator Storage +1 more CA22
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Stanstead Abbots, Ware, Hertfordshire, SG12 8JY (3 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

Storage Storage (Duration 0.5h) PEAK GEN POWER 10 LIMITED Peak Gen Power 10 Peak Gen Power 10 +1 more Conditional SG12
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Stanstead Abbots Ware Hertfordshire SG12 8JY (3 components)
Storage Storage (Duration 0.5h) PEAK GEN POWER 10 LIMITED Peak Gen Power 10 Peak Gen Power 10 +1 more Conditional SG12
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA13 0PQ (3 components)

A Prospective New Build Battery Storage facility (3)

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ (3 components)
Storage Storage (Duration 0.5h) CBS ENERGY STORAGE ASSETS UK LIMITED New Build Generating CMU Roosecote EFR Roosecote EFR +1 more LA13
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Land at Jarrow Slake Port of Tyne Adjacent to Jarrow Road SOUTH SHIELDS NE34 9PS (6 components)
Storage Storage (Duration 0.5h) FS Port Of Tyne Limited Battery Energy Storag Services 4 PT 35MW Battery Energy Storage Services 4 PT 35MW +2 more NE34
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Land at Jarrow Slake, Port of Tyne, Adjacent to Jarrow Road, South Shields, NE34 9PS (6 components)
• New build battery
• Operational battery
Storage Storage (Duration 0.5h) FS Port Of Tyne Limited Port of Tyne Energy Storage Port of Tyne Energy Storage NE34
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Land at Huggins Hall Farm, Turnden Road, Hartley, Kent, TN17 2QJ (6 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage Storage (Duration 0.5h) GLASSENBURY BATTERY STORAGE LIMITED New Build Generating CMU Glassenbury Storage Glassenbury Storage +2 more TN17
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Blackburn Meadows Power Station, Alsing Road, Tinsley, Sheffield, S9 1HF (3 components)

A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The …

Storage Storage (Duration 0.5h) E.ON UK CHP LIMITED New Build Generating CMU Blackburn Meadows Battery Blackburn Meadows Battery +1 more S9
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Amersham Road, Denham, Buckinghamshire, SL9 7AW (5 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Storage Storage (Duration 0.5h) Field Gerrards Cross Ltd Peak Gen Power 27 Peak Gen Power 27 +1 more Conditional SL9
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Amersham Road Denham Buckinghamshire SL9 7AW (5 components)
Storage Storage (Duration 0.5h) Field Gerrards Cross Ltd New Build Generating CMU Peak Gen Power 27 Peak Gen Power 27 Conditional SL9
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 11 locations