Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 0.5h)

14 unique locations (48 components)

Active MW: 7408.38 MW
Inactive MW: 379.03 MW
Woodend Farm, Bigrigg, Cumbria, CA22 2TA (4 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Storage Storage (Duration 0.5h) CLEATOR BATTERY STORAGE LIMITED New Build Generating CMU Cleator Storage Cleator Storage +1 more CA22
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
SWEB Estate, Romney Avenue, Lockleaze, Bristol, BS7 9ST (3 components)

battery storage (3)

Storage Storage (Duration 0.5h) HC ESS2 LIMITED New Build Generating CMU ALPHA ALPHA BS7
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Roundponds Farm, Shurnold, Melksham, Wiltshire, SN12 8DF (3 components)
• A 10MW Existing Generating Battery Storage Site
• A 10MW New Build Battery Storage Site
Storage Storage (Duration 0.5h) HC ESS3 LIMITED Roundponds Storage 1 Roundponds Storage 1 +1 more SN12
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Roundponds Farm Shurnold Melksham Wiltshire SN12 8DF (3 components)
Storage Storage (Duration 0.5h) HC ESS3 LIMITED Existing Generating CMU Roundponds Storage 1 Roundponds Storage 1 SN12
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA13 0PQ (3 components)

A Prospective New Build Battery Storage facility (3)

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ (3 components)

A Prospective New Build Battery Storage facility

Storage Storage (Duration 0.5h) CBS ENERGY STORAGE ASSETS UK LIMITED New Build Generating CMU Roosecote EFR Roosecote EFR +1 more LA13
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Land North Of Oaklands Park Lane Cottingham East Riding Of Yorkshire, HU16 5RX (Nearrest postcode to grid reference: HU16 5SB) (2 components)

Battery Storage Plant

Storage Storage (Duration 0.5h) CREYKE BECK STORAGE LIMITED New Build Generating CMU Creyke Beck Storage 026 Creyke Beck Storage 052 HU16
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land at Jarrow Slake Port of Tyne Adjacent to Jarrow Road SOUTH SHIELDS NE34 9PS (6 components)
Storage Storage (Duration 0.5h) FS Port Of Tyne Limited Battery Energy Storag Services 4 PT 35MW Battery Energy Storage Services 4 PT 35MW +2 more NE34
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Land at Jarrow Slake, Port of Tyne, Adjacent to Jarrow Road, South Shields, NE34 9PS (6 components)
• New build battery
• Operational battery
Storage Storage (Duration 0.5h) FS Port Of Tyne Limited Port of Tyne Energy Storage Port of Tyne Energy Storage NE34
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Land at Jarrow Slake Port of Tyne Adjacent to Jarrow Road South Shields NE34 9PS (2 components)
Storage Storage (Duration 0.5h) SOUTH SHIELDS ENERGY STORAGE LTD Existing Generating CMU Port of Tyne Energy Storage Port of Tyne Energy Storage NE34
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Blackburn Meadows Power Station, Alsing Road, Tinsley, Sheffield, S9 1HF (3 components)

A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The …

Storage Storage (Duration 0.5h) E.ON UK CHP LIMITED New Build Generating CMU Blackburn Meadows Battery Blackburn Meadows Battery +1 more S9
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Albion Road, Dartford, Kent, DA1 5PZ (6 components)

battery storage

Storage Storage (Duration 0.5h) HC ESS2 LIMITED New Build Generating CMU ALPHA ALPHA DA1
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Loading map...
Showing 14 locations