Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Solar Photovoltaic

82 unique locations (316 components) - Page 3 of 4

Littleton Pastures Solar, Lakeshill Road, Worcestershire, WR118TS (3 components)

The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA..

Active • 2027-28 (T-4), 2026-27 (T-4)
3.89 MW
Llanwern Farm Solar Park, Whitson, Newport, NP18 2AY (4 components)

75 MW solar PV site with a 50 MVA export connection. Commissioned on 10/03/2021.

Active • 2028-29 (T-4), 2025-26 (T-1)
11.70 MW
3.32 MW
Lower Strensham PV, Bourne Road, Worcester, WR8 9DT (4 components)

40 MW solar PV site with a 25 MW export connection. Commissioned 29/01/2021.

Active • 2028-29 (T-4), 2025-26 (T-1)
5.84 MW
Malmpit Hill, Codford, Wiltshire, England, BA12 0FD (3 components)
• Existing Solar PV
• Solar PV
Active • 2026-27 (T-4), 2025-26 (T-1) ...
1.31 MW
Manor Farm, Burnett, Keynsham, Bristol, Somerset, BS31 2ED (2 components)

New Build CMU comprising of Solar PV and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4)
2.21 MW
Manor Farm, Church Road, Maiden Newton, Dorchester, DT2 0AA (1 component)

Solar Voltaic generation scheme connected to the distribution network

Active • 2025-26 (T-4)
2.50 MW
New Parks Estate, Huby, York, North Yorkshire, YO61 1JD (1 component)

Solar photovoltaic generation scheme connected to the distribution network

Active • 2025-26 (T-4)
Newton Farm Newton South Queensferry West Lothian EH30 9SN (1 component)

Solar photovoltaic generation scheme connected to the distribution network

Active • 2025-26 (T-4)
Offham Landfill Site, Teston Road, Offham, West Malling, Kent, ME19 5PF (5 components)

Solar PV generation site

Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.46 MW
Ongar Landfill Site, Mill Lane, Ongar, Essex, CM5 9RG (1 component)

Solar PV generation site

Active • 2025-26 (T-4)
QUIDHAMPTON, POLEHAMPTON FARM, ASHE LANE, OVERTON, BASINGSTOKE, RG25 3BS (1 component)

Solar photovoltaic generation scheme connected to the distribution network

Active • 2025-26 (T-4)
Rhyd y Groes, Llanbadrig, Rhosgoch, Isle of Anglesey, LL66 0AT (3 components)
• CMU is a photovoltaic system
• Porth Wen MPAN ID: 1300061061592 CMU is a photovoltaic system connected to the distribution system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
5.17 MW
Rolleston Park Farm, Lodge Hill, Tutbury, Staffordshire, DE13 9HQ (2 components)

12 MW Solar PV Array

Active • 2028-29 (T-4), 2025-26 (T-1)
1.41 MW
Site North of Hightown Drove Burwell Cambridgeshire, CB25 0FU (3 components)
• Burwell MPAN ID: 1050002283664 CMU is a photovoltaic system connected to the transmission system.
• CMU is a photovoltaic system
Active • 2026-27 (T-4), 2025-26 (T-1) ...
5.22 MW
South Lowfield Farm, Lowfield Lane, Kirkby Fleetham, Northallerton, North Yorkshire DL7 0SY (3 components)

Solar PV generating asset with a TIC of 50 MWp and a connection capacity of 40 MVA. It was commissioned on 14/07/2021.

Active • 2028-29 (T-4), 2025-26 (T-1)
6.80 MW
Standingfauld Farm, Muthill, CRIEFF, Perthshire, PH5 2BS (1 component)

Solar PV Project

Active • 2027-28 (T-4)
0.89 MW
Stewartby Landfill Site, Green Lane, Stewartby, Bedfordshire, MK43 9LY (2 components)
• Solar PV generation site
• The site comprises of gas reciprocating unit(s)
Active • 2025-26 (T-4), 2022-23 (T-4)
Sutton Courtenay Landfill Site, Appleford Sidings, Sutton Courtenay, Abingdon, Oxfordshire, OX14 4PW (4 components)
• Gas fired reciprocating engine(s)
• Solar PV generation site
• The site comprises of gas reciprocating unit(s)
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Sutton on Forest Solar Plainville Lane, Wigginton, York, YO32 2RG (1 component)

Solar photovoltaic generation scheme connected to the distribution network

Active • 2025-26 (T-4)
Tarmac Dunbar, Dunbar Works, Dunbar, East Lothian, EH42 1SL (1 component)

New Build CMU comprising of Solar PV and associated plant.

Active • 2028-29 (T-4)
1.25 MW
Tarmac Quarry, Whisby, Lincoln, Lincolnshire, LN6 9BT (4 components)

New Build CMU comprising of Solar PV and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4)
1.59 MW
Threemiletown Solar Farm Trinlaymire Farm Linlithgow West Lothian (1 component)

Solar photovoltaic generation scheme connected to the distribution network

Active • 2025-26 (T-4)
Loading map...
Showing 25 locations