Solar Photovoltaic

15 unique locations (100 components)

Wraxall Manor Farm, Wraxall, Dorset, DT2 0HW. (1 component)

New build generating CMU component - solar photovoltaic park known as Higher Wraxall Solar Park

Active • 2027-28 (T-4)
0.64 MW
Winterton Landfill Site, Coleby Road, West Halton, Winterton, Lincolnshire, DN15 9TG (10 components)
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• Solar PV generation site
• SolarPV generating station
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.50 MW
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (5 components)
• Load reduction on site supported by non-exporting standby generation.
• New build generating CMU component - Whaddon Farm BESS
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park.
Active • 2027-28 (T-4), 2024-25 (T-1) ...
5.00 MW
Vicarage Drove, Bicker CP, Boston, Lincolnshire, England, PE20 3BQ, United Kingdom (3 components)
• New build 49.995MW / 99.990 MWh battery energy storage system.
• New build CMU. A co-located battery and solar PV site, with a solar generation capacity of 70MW and a shared grid connection.
Active • 2027-28 (T-4), 2025-26 (T-1)
18.20 MW
Tummel Power Station, Pitlochry, Perthshire, PH16 5SB (41 components)
• 1 x hydro turbine & synchronous generator
• Battery Energy Storage system operating alongside solar farm
• Solar Farm consisting of solar PV modules and inverters
Active • 2028-29 (T-4), 2027-28 (T-4) ...
104.16 MW
Offham Landfill Site, Teston Road, Offham, West Malling, Kent, ME19 5PF (6 components)
• Battery Energy Storage System
• Cruachan pump storage hydro plant - Unit 3
• Solar PV generation site
Active • 2027-28 (T-4), 2025-26 (T-1) ...
1.89 MW
Littleton Pastures Solar, Lakeshill Road, Worcestershire, WR118TS (3 components)
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA..
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.49 MW
Ling Hall Coalpit Lane Lawford Heath Rugby Warwickshire CV23 9HH (3 components)

SolarPV generating station

Active • 2027-28 (T-4), 2024-25 (T-1) ...
0.76 MW
Land lying between the villages of Mulbarton and Swainsthorpe, south of Norwich, NR14 8AJ (2 components)
• A 50MW New Build Battery Storage site
• CMU is a photovoltaic system
Active • 2027-28 (T-4), 2022-23 (T-4)
2.66 MW
land at Keelings Road, Southminster, CM0 7JF (5 components)
• New build generating CMU component known as Dengie BESS
• New build generating CMU component known as Dengie Solar Park
Active • 2027-28 (T-4), 2025-26 (T-1)
4.43 MW
Land At, Elms Farm, Newbold Road, Newbold Pacey, Warwickshire, CV35 9DP (1 component)

A Solar site that will be situated on 5 fields and comprise of mounted Silicon PV panels, String Inverters and Transformers. The PV panels will produce DC electricity, which will …

Active • 2027-28 (T-4)
1.27 MW
Land adjacent Electricity Substation, Clay Hill Pit, Dormington, Hereford, Herefordshire, HR1 4EP (10 components)
• New Build CMU comprising of Solar PV and associated plant
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.19 MW
Ducklington Farm Course Hill Lane Ducklington Witney OX29 7YL (1 component)

A Solar site that will be situated on approximately 46 Hectares of land and comprise of mounted Silicon PV panels, String Inverters and Transformers. The PV panels will produce DC …

Active • 2027-28 (T-4)
1.14 MW
Boston Landfill Site, Slippery Gowt Lane, Wyberton, Boston, Lincolnshire, PE21 7AA (8 components)
• 1 x hydro turbine & synchronous generator
• Solar PV generation site
• The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
27.09 MW
Loading map...
Showing 15 locations