28 unique locations (199 components) - Page 1 of 2

Winterton Landfill Site, Coleby Road, West Halton, Winterton, Lincolnshire, DN15 9TG (8 components)
• Solar PV generation site
• Solar photovoltaic generating station
• SolarPV generating station
Active • 2026-27 (T-4), 2025-26 (T-4) ...
0.42 MW
Vicarage Drove, Bicker CP, Boston, Lincolnshire, England, PE20 3BQ, United Kingdom (4 components)
• New build 49.995MW / 99.990 MWh battery energy storage system.
• New build CMU. A co-located battery and solar PV site, with a solar generation capacity of 70MW and a shared grid connection.
Active • 2027-28 (T-4), 2025-26 (T-1)
22.81 MW
South Lowfield Farm, Lowfield Lane, Kirkby Fleetham, Northallerton, North Yorkshire DL7 0SY (3 components)

Solar PV generating asset with a TIC of 50 MWp and a connection capacity of 40 MVA. It was commissioned on 14/07/2021.

Active • 2028-29 (T-4), 2025-26 (T-1)
6.80 MW
Site North of Hightown Drove Burwell Cambridgeshire, CB25 0FU (3 components)
• Burwell MPAN ID: 1050002283664 CMU is a photovoltaic system connected to the transmission system.
• CMU is a photovoltaic system
Active • 2026-27 (T-4), 2025-26 (T-1) ...
5.22 MW
Rolleston Park Farm, Lodge Hill, Tutbury, Staffordshire, DE13 9HQ (2 components)

12 MW Solar PV Array

Active • 2028-29 (T-4), 2025-26 (T-1)
1.41 MW
Rhyd y Groes, Llanbadrig, Rhosgoch, Isle of Anglesey, LL66 0AT (3 components)
• CMU is a photovoltaic system
• Porth Wen MPAN ID: 1300061061592 CMU is a photovoltaic system connected to the distribution system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
5.17 MW
Offham Landfill Site, Teston Road, Offham, West Malling, Kent, ME19 5PF (5 components)

Solar PV generation site

Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.46 MW
Malmpit Hill, Codford, Wiltshire, England, BA12 0FD (3 components)
• Existing Solar PV
• Solar PV
Active • 2026-27 (T-4), 2025-26 (T-1) ...
1.31 MW
Lower Strensham PV, Bourne Road, Worcester, WR8 9DT (4 components)

40 MW solar PV site with a 25 MW export connection. Commissioned 29/01/2021.

Active • 2028-29 (T-4), 2025-26 (T-1)
5.84 MW
Llanwern Farm Solar Park, Whitson, Newport, NP18 2AY (4 components)

75 MW solar PV site with a 50 MVA export connection. Commissioned on 10/03/2021.

Active • 2028-29 (T-4), 2025-26 (T-1)
11.70 MW
Little Staughton Airfield Solar Park, Top Farm, Staploe, Saint Neots, PE19 5JB (4 components)

A 50 MWp solar asset with a 40 MW grid connection. Commissioned on 26/02/2021.

Active • 2028-29 (T-4), 2025-26 (T-1)
9.33 MW
Ling Hall Coalpit Lane Lawford Heath Rugby Warwickshire CV23 9HH (7 components)

SolarPV generating station

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.37 MW
Land to the south of centenary way, Sutton Bridge, PE12 9TF (3 components)
• CMU is a photovoltaic system
• Sutton Bridge MPAN ID: 1170001824960 CMU is a photovoltaic system connected to the transmission system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
5.22 MW
Land to the North of Tye Lane, Ipswich, IP8 4NP (4 components)

CMU is a photovoltaic system (4)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.92 MW
land at Keelings Road, Southminster, CM0 7JF (6 components)
• New build generating CMU component known as Dengie BESS
• New build generating CMU component known as Dengie Solar Park
Active • 2027-28 (T-4), 2025-26 (T-1)
5.29 MW
Land at Chapel Street, Stapleton, LE9 8FT (2 components)

A 21 MW solar PV asset with a 15 MVA export connection currently under construction.

Active • 2025-26 (T-1)
1.64 MW
Lakeshill Road, Worcestershire, WR11 8TS (4 components)
• The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA.
• The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA..
Active • 2028-29 (T-4), 2025-26 (T-1)
5.16 MW
High Garrett, Sisted, Braintree, Essex, CM77 8BX (4 components)

CMU component is a 8.444 MWp solar PV site and shares its 10.900 MW export and import MPAN connection with a second PV asset, which has a capacity of 4.997 …

Active • 2028-29 (T-4), 2025-26 (T-1)
1.37 MW
Dormington Solar PV Generating Plant, Clay Hill Pit, Dormington, Hereford, Herefordshire, HR1 4EP (1 component)

Existing CMU comprising of Solar PV and associated plant.

Active • 2025-26 (T-1)
2.22 MW
Cotham Grange PV Cotham Lane HAWTON Nottinghamshire NG24 3RJ (2 components)

50 MW solar photovoltaic plant commissioned on 18/01/21.

Active • 2028-29 (T-4), 2025-26 (T-1)
4.62 MW
Cotham Grange PV Cotham Lane HAWTON Nottinghamshire NG24 3RJ (2 components)

50 MW solar photovoltaic plant commissioned on 18/01/21.

Active • 2028-29 (T-4), 2025-26 (T-1)
4.62 MW
Bosworth Solar Farm, Hall Farm, Newbold Verdon, Leicestershire LE9 9NL (2 components)

The component is a 5.4 MWp solar PV site with a 10.527 MVA export connection. This export connection is shared with an adjacent 5 MWp solar PV site which claims …

Active • 2028-29 (T-4), 2025-26 (T-1)
0.58 MW
Bosworth Solar Farm, Hall Farm, Newbold Verdon, Leicestershire LE9 9NL (2 components)

The component is a 5.4 MWp solar PV site with a 10.527 MVA export connection. This export connection is shared with an adjacent 5 MWp solar PV site which claims …

Active • 2028-29 (T-4), 2025-26 (T-1)
0.58 MW
Boston Landfill Site, Slippery Gowt Lane, Wyberton, Boston, Lincolnshire, PE21 7AA (6 components)

Solar PV generation site

Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.30 MW
Boscar Grange Farm York Yo61 3NQ (7 components)

Solar Farm consisting of solar PV modules and inverters

Active • 2025-26 (T-1), 2024-25 (T-4) ...
1.93 MW