Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Solar Photovoltaic

11 unique locations (147 components)

AB51 (98 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
204.06 MW
Boston Landfill Site, Slippery Gowt Lane, Wyberton, Boston, Lincolnshire, PE21 7AA (6 components)

Solar PV generation site

Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.30 MW
Land adjacent Electricity Substation, Clay Hill Pit, Dormington, Hereford, Herefordshire, HR1 4EP (7 components)

New Build CMU comprising of Solar PV and associated plant

Active • 2027-28 (T-4), 2026-27 (T-4) ...
6.87 MW
Land to the south of centenary way, Sutton Bridge, PE12 9TF (3 components)
• CMU is a photovoltaic system
• Sutton Bridge MPAN ID: 1170001824960 CMU is a photovoltaic system connected to the transmission system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
5.22 MW
Ling Hall Coalpit Lane Lawford Heath Rugby Warwickshire CV23 9HH (7 components)

SolarPV generating station

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.37 MW
Malmpit Hill, Codford, Wiltshire, England, BA12 0FD (3 components)
• Existing Solar PV
• Solar PV
Active • 2026-27 (T-4), 2025-26 (T-1) ...
1.31 MW
Offham Landfill Site, Teston Road, Offham, West Malling, Kent, ME19 5PF (5 components)

Solar PV generation site

Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.46 MW
Rhyd y Groes, Llanbadrig, Rhosgoch, Isle of Anglesey, LL66 0AT (3 components)
• CMU is a photovoltaic system
• Porth Wen MPAN ID: 1300061061592 CMU is a photovoltaic system connected to the distribution system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
5.17 MW
Site North of Hightown Drove Burwell Cambridgeshire, CB25 0FU (3 components)
• Burwell MPAN ID: 1050002283664 CMU is a photovoltaic system connected to the transmission system.
• CMU is a photovoltaic system
Active • 2026-27 (T-4), 2025-26 (T-1) ...
5.22 MW
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (4 components)
• New build generating CMU component - Whaddon Farm BESS
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park.
Active • 2027-28 (T-4), 2024-25 (T-1)
1.99 MW
Winterton Landfill Site, Coleby Road, West Halton, Winterton, Lincolnshire, DN15 9TG (8 components)
• Solar PV generation site
• Solar photovoltaic generating station
• SolarPV generating station
Active • 2026-27 (T-4), 2025-26 (T-4) ...
0.42 MW
Loading map...
Showing 11 locations