Solar Photovoltaic

29 unique locations (112 components) - Page 1 of 2

Active MW: 324.17 MW
Inactive MW: 1.66 MW
Winterton Landfill Site, Coleby Road, West Halton, Winterton, Lincolnshire, DN15 9TG (5 components)
• Solar PV generation site (2)
• SolarPV generating station
Solar Photovoltaic ALKANE ENERGY UK LIMITED INFINIS ALTERNATIVE ENERGIES LIMITED New Build Generating CMU Winterton Winterton Bletchley +3 more DN15
Active • 2026-27 (T-4), 2025-26 (T-4) ...
0.58 MW
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (6 components)
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park. (2)
• New build generating CMU component - Whaddon Farm BESS
Solar Photovoltaic Storage (Duration 2h) BRITISH SOLAR RENEWABLES LIMITED New Build Generating CMU Whaddon Farm BESS Whaddon Farm Solar Park BA14
Active • 2029-30 (T-4), 2027-28 (T-4) ...
7.89 MW
Vicarage Drove, Bicker CP, Boston, Lincolnshire, England, PE20 3BQ, United Kingdom (5 components)
• New build 49.995MW / 99.990 MWh battery energy storage system. (2)
• New build CMU. A co-located battery and solar PV site, with a solar generation capacity of 70MW and a shared grid connection.
Active • 2029-30 (T-4), 2027-28 (T-4) ...
34.27 MW
South Lowfield Farm, Lowfield Lane, Kirkby Fleetham, Northallerton, North Yorkshire DL7 0SY (4 components)

Solar PV generating asset with a TIC of 50 MWp and a connection capacity of 40 MVA. It was commissioned on 14/07/2021. (2)

Solar Photovoltaic NEXTPOWER SOUTH LOWFIELD LIMITED Existing Generating CMU South Lowfield DL7
Active • 2029-30 (T-4), 2028-29 (T-4) ...
9.24 MW
Site North of Hightown Drove Burwell Cambridgeshire, CB25 0FU (3 components)
• Burwell MPAN ID: 1050002283664 CMU is a photovoltaic system connected to the transmission system.
• CMU is a photovoltaic system
Solar Photovoltaic BEECHGREEN ENERGYFARM LIMITED New Build Generating CMU Burwell EDFR Burwell +1 more CB25
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.76 MW
Rhyd y Groes, Llanbadrig, Rhosgoch, Isle of Anglesey, LL66 0AT (3 components)
• CMU is a photovoltaic system
• Porth Wen MPAN ID: 1300061061592 CMU is a photovoltaic system connected to the distribution system.
Solar Photovoltaic PORTH WEN SOLAR LIMITED New Build Generating CMU EDFR Porth Wen EDFR Porth Wen +1 more LL66
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.70 MW
Offham Landfill Site, Teston Road, Offham, West Malling, Kent, ME19 5PF (5 components)

Solar PV generation site

Solar Photovoltaic ALKANE ENERGY UK LIMITED ALKANE ENERGY CM LIMITED New Build Generating CMU Offham Solar Offham Solar +1 more ME19
Active • 2027-28 (T-4), 2026-27 (T-1) ...
1.90 MW
Newton Farm Newton South Queensferry West Lothian, It is to be noted that for Grid Connection correspondence post code of EH30 9SN was used. However, the project site`s post code is yet to be identified. We will notify the DB as soon as the exact post code is available. (6 components)
• BESS generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 20MW import
• Solar photovoltaic generation scheme connected to the distribution network
• bess photovoltaic generation scheme connected to the distribution network (33kV). 29.9MW export and 20MW import
Active • 2027-28 (T-4), 2026-27 (T-4)
37.87 MW
Malmpit Hill, Codford, Wiltshire, England, BA12 0FD (3 components)
• Existing Solar PV
• Solar PV
Solar Photovoltaic CBS SOLAR ASSETS UK LIMITED New Build Generating CMU 8RESAJ 8RESAJ BA12
Active • 2026-27 (T-4), 2025-26 (T-1) ...
1.94 MW
Lower Strensham PV, Bourne Road, Worcester, WR8 9DT (4 components)

40 MW solar PV site with a 25 MW export connection. Commissioned 29/01/2021.

Solar Photovoltaic NEXTPOWER LOWER STRENSHAM LIMITED Existing Generating CMU Lower Strensham WR8
Active • 2029-30 (T-4), 2028-29 (T-4) ...
5.81 MW
Llanwern Farm Solar Park, Whitson, Newport, NP18 2AY (4 components)

75 MW solar PV site with a 50 MVA export connection. Commissioned on 10/03/2021.

Active • 2029-30 (T-4), 2028-29 (T-4) ...
11.65 MW
Littleton Pastures Solar, Lakeshill Road, Worcestershire, WR11 8TS (2 components)

The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA..

Solar Photovoltaic SSE UTILITY SOLUTIONS LIMITED Littleton Pastures Solar Littleton Pastures Solar WR11
Active • 2027-28 (T-4), 2026-27 (T-4)
2.49 MW
Little Staughton Airfield Solar Park, Top Farm, Staploe, Saint Neots, PE19 5JB (4 components)

A 50 MWp solar asset with a 40 MW grid connection. Commissioned on 26/02/2021.

Active • 2029-30 (T-4), 2028-29 (T-4) ...
9.29 MW
Leylodge, Aberdeenshire, AB51 0XY (2 components)
• New Build CMU comprising of Solar PV and associated plant
• New Build Generating CMU comprising of battery storage and associated plant.
Solar Photovoltaic Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Keynesham Kintore Not Prequalified AB51
Active • 2026-27 (T-4)
8.27 MW
Land to the south of centenary way, Sutton Bridge, PE12 9TF (3 components)
• CMU is a photovoltaic system
• Sutton Bridge MPAN ID: 1170001824960 CMU is a photovoltaic system connected to the transmission system.
Solar Photovoltaic HOLLYGREEN ENERGYFARM LIMITED New Build Generating CMU EDFR Sutton Bridge EDFR Sutton Bridge +1 more PE12
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.75 MW
Land to the North of Tye Lane, Ipswich, IP8 4NP (5 components)

CMU is a photovoltaic system

Solar Photovoltaic DAMSONGREEN ENERGYFARM LIMITED EDF ENERGY RENEWABLES LIMITED New Build Generating CMU EDFR Tye Lane EDFR Tye Lane +1 more IP8
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.99 MW
Land near Ellbridge Lane, Hatt, Saltash, PL12 6PU (2 components)
• New Build CMU comprising of Solar PV and associated plant
• New Build Generating CMU comprising of battery storage and associated plant.
Solar Photovoltaic Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Landulph Battery Landulph Solar Not Prequalified PL12
Active • 2026-27 (T-4)
10.58 MW
Land lying between the villages of Mulbarton and Swainsthorpe, south of Norwich, NR14 8AJ (2 components)

CMU is a photovoltaic system

Solar Photovoltaic ASHGREEN ENERGYFARM LIMITED New Build Generating CMU EDFR Bloys Grove NR14
Active • 2027-28 (T-4), 2026-27 (T-1)
4.31 MW
land at Keelings Road, Southminster, CM0 7JF (6 components)
• New build generating CMU component known as Dengie BESS
• New build generating CMU component known as Dengie Solar Park
Solar Photovoltaic Storage (Duration 2h) BRITISH SOLAR RENEWABLES LIMITED New Build Generating CMU Dengie BESS Dengie Solar Park Not Prequalified CM0
Active • 2029-30 (T-4), 2027-28 (T-4) ...
5.55 MW
Land adjacent Electricity Substation, Clay Hill Pit, Dormington, Hereford, Herefordshire, HR1 4EP (5 components)

New Build CMU comprising of Solar PV and associated plant

Solar Photovoltaic CONRAD (LARPORT) LIMITED New Build Generating CMU Larport Larport +1 more HR1
Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.32 MW
Lakeshill Road, Worcestershire, WR11 8TS (3 components)
• The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA.
• The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA..
Solar Photovoltaic SSE RENEWABLES SOLAR & BATTERY HOLDINGS LIMITED New Build Generating CMU Littleton Pastures Solar Littleton Pastures Solar WR11
Active • 2028-29 (T-4), 2026-27 (T-1) ...
3.82 MW
High Garrett, Sisted, Braintree, Essex, CM77 8BX (4 components)

CMU component is a 8.444 MWp solar PV site and shares its 10.900 MW export and import MPAN connection with a second PV asset, which has a capacity of 4.997 …

Solar Photovoltaic NEXTPOWER HIGH GARRETT LIMITED Existing Generating CMU High Garrett CM77
Active • 2029-30 (T-4), 2028-29 (T-4) ...
1.37 MW
Cotham Grange PV, Cotham Lane, HAWTON, Nottinghamshire, NG24 3RJ (4 components)

50 MW solar photovoltaic plant commissioned on 18/01/21.

Active • 2029-30 (T-4), 2028-29 (T-4) ...
9.19 MW
Colton Farm Lochead Dunfermline Fife, KY 10. This address and pincode was used for grid correspondence. However, the site`s own post-code is yet to be identified. We will notify the DB as soon as it is available., Please see the cover letter for more details. (5 components) Geocoding Needed
• BESS generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
• Solar generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
Active • 2026-27 (T-4), 2024-25 (T-1)
39.67 MW
Cleve Hill Solar Park, Seasalter Road, Kent, ME13 9EE (1 component)

New build Solar PV project totalling 373MW, with this CMU being 205.2MW of that total. Seperatley metered and a seperate BMU from the additional capacity. Connected to the National Grid …

Active • 2026-27
6.79 MW