Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

517 unique locations (2572 components) - Page 7 of 21

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
North Avenue, Marston Green, Birmingham, B40 1NT. (6 components)

Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
8.78 MW
North Avenue, Marston Green, Birmingham, B40 1NT (12 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Gas Generation units at 1013kWe
• Proposed Gas Generation units at 1013kWe
Active • 2024-25 (T-4), 2023-24 (T-4) ...
8.78 MW
No.1 Maxwell Road, Woodston Industrial Estate, Peterborough, PE2 7JB (6 components)
• A power plant, with associated civil works, switchgear and electrical connection.
• A recently completed power plant, with associated civil works, switchgear and electrical connection.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
56.82 MW
Newton Aycliffe, CO Durham DL5 6EA (15 components)
• Existing Gas Engine
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
23.41 MW
Newton Aycliffe CO Durham DL5 6EA (6 components)

Existing Gas Engine (3)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
3.22 MW
Newmarket Lane, Stanley, Near Wakefield, WF3 4BY (11 components)
• Gas fired generating units
• Gas fired reciprocating engines
• Gas reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-1) ...
25.08 MW
Newmarket Lane Stanley Near Wakefield WF3 4BY (1 component)

Gas reciprocating engines

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU CMM Portfolio WF3
Active • 2024-25 (T-1)
0.30 MW
Neston Power Generation Plant, Longacres Road, Clayhill Light Industrial Park, Neston, CH64 3RL (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD (NESTON) LIMITED New Build Generating CMU Neston CH64
Active • 2024-25 (T-1)
2.36 MW
Moss Lane, Blackrod, Bolton, Lancashire BL6 5GJ (5 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines MOSS POWER LIMITED New Build Generating CMU Moss Moss +2 more BL6
Active • 2024-25 (T-4), 2023-24 (T-4) ...
76.10 MW
Monkton Road, Wakefield, Yorkshire, WF2 7AL (13 components)
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Diesel) UK POWER RESERVE LIMITED Existing Generating CMU Monckton Road Power Station Monckton Road Power Station +4 more WF2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
4.82 MW
Mill Lane, Nottinghamshire NG17 9LG (1 component)

A 7.5MW gas generating station..

Reciprocating engines WALKER & SON (HAULIERS) LIMITED New Build Generating CMU BENTINCK Not Prequalified NG17
Active • 2026-27 (T-4)
7.14 MW
Mill Hill, North West Industrial Estate, Peterlee, Durham, SR8 2JF (1 component)

The CMU component consist of gas fired reciprocating engines, organic rankine cycle turbines and stack gas-recovery carbon capture to be installed on designated land at Mill Hill, North West Industrial …

Active • 2027-28 (T-4)
28.31 MW
Mill Hill, Northwest Industrial Estate, Peterlee, County Durham, SR8 2JF (1 component)

The CMU component consist of gas fired reciprocating engines to be installed on designated land at at Mill Hill, Northwest Industrial Estate, Peterlee, SR8 2JF, County Durham

Active • 2024-25 (T-4)
33.33 MW
Mill Hill, Northwest Industrial Estate, Peterlee, County Durham, SR8 2JF (1 component)

The CMU component consist of gas fired reciprocating engines to be installed on designated land at at Mill Hill, Northwest Industrial Estate, Peterlee, SR8 2JF, County Durham

Reciprocating engines RELIANCE ENERGY LIMITED New Build Generating CMU Not Prequalified SR8
Active • 2024-25 (T-4)
Millfield Lane, Haydock Industrial Estate, Haydock, St Helens, WA11 9UT (9 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
36.07 MW
Millfield Lane Haydock Industrial Estate Haydock St Helens WA11 9UT (4 components)

A completed power plant, with associated civil works, switchgear and electrical connection. (3)

Reciprocating engines PEAK GEN POWER LIMITED Existing Generating CMU Peak Gen Power Haydock Peak Gen Power Haydock +2 more WA11
Active • 2024-25 (T-1), 2023-24 (T-1) ...
10.26 MW
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SU (10 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
120.38 MW
Merlin Park, Burscough, L40 8JY (10 components)
• Works required to complete the site will include:- 1 Construction of a Grid Connection between the site and the Distribution Network 2 Construction of gas connection between the site and the Gas Network 3 Construction of site compound including surfacing of compound, drainage and erection of fencing 4 Construction of multiple engine and infrastructure bases 5 Installation of multiple new containerised reciprocating gas engines 6 Electrical work to connect generating sets to grid connection including supply of transformers and switchgear as necessary 7 Gas work to connect the generating sets to the gas supply 8 Commissioning
• Works required to complete the site will include:- 1 Construction of a Grid Connection between the site and the Distribution Network 2 Construction of gas connection between the site and the Gas Network 3 Construction of site compound including surfacing of compound, drainage and erection of fencing 4 Construction of multiple engine and infrastructure bases 5 Installation of multiple new containerised reciprocating gas engines 6 Electrical work to connect generating sets to grid connection including supply of transformers and switchgear as necessary 7 Gas work to connect the generating sets to the gas supply 8 Commissioning
Active • 2025-26 (T-4), 2024-25 (T-4) ...
76.11 MW
Meek St, Royton, Oldham OL2 6HL (2 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines STOR 132 Ltd New Build Generating CMU OL2
Active • 2028-29 (T-4)
14.96 MW
Meek Street, Royton, Oldham, Lancashire OL2 6HL (6 components)
• Battery Storage Facility
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Energy facility comprising of reciprocating engine sets.
Storage Reciprocating engines OCGT and Reciprocating Engines STOR 126 LTD New Build Generating CMU Birshaw Birshaw +3 more OL2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
81.80 MW
Maybrook Road, Maybrook Business Park, Minworth, Sutton Coldfield, West Midlands, B76 1AL (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD (CASTLE BROMWICH) LIMITED New Build Generating CMU Castle Bromwich B76
Active • 2025-26 (T-1)
11.87 MW
Maybrook Road, Maybrook Business Park, Minworth, Sutton Coldfield, B76 1BE (7 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Castle Bromwich Castle Bromwich +2 more B76
Active • 2026-27 (T-4), 2025-26 (T-4) ...
36.31 MW
Marsh Green Industrial Park, Marsh Barton Trading Estate, Exeter, Devon, EX2 8NY (8 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
305.00 MW
Marshall Road, Plympton, Plymouth, PL7 4NW (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU Linketty Lane Linketty Lane Not Prequalified PL7
Active • 2024-25 (T-4)
11.33 MW
Marl Road, Knowsley Industrial Park, Kirkby, Knowsley, L33 7UH (1 component)

A new build, gas fueled generation station

Reciprocating engines BAKER STREET GENERATION LIMITED New Build Generating CMU Knowsley Not Prequalified L33
Active • 2025-26 (T-4)
19.09 MW
Loading map...
Showing 25 locations