Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

517 unique locations (2572 components) - Page 6 of 21

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Poole Bank Nurseries , Common Lane, Welton, Hull, HU15 1UT (11 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Humber Power Station Humber Power Station +4 more HU15
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Plot D2, Kingdom Avenue, Westbury, Wiltshire, South West England, England, BA13 4EW (4 components)

A 7.220MW reciprocating gas engine power plant comprising of 5 x 1.5MW engines to be installed on designated land at West Wilts Trading Estate.

Reciprocating engines GRIDSOURCE (KINGDOM AVENUE) LIMITED New Build Generating CMU Kingdom Avenue Kingdom Avenue Not Prequalified BA13
Active • 2026-27 (T-4), 2025-26 (T-4) ...
19.64 MW
Plot B Land at Waterswallows Road, Buxton, SK17 7JT (2 components)
• 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
Reciprocating engines FPC ELECTRIC LAND LIMITED New Build Generating CMU Waterswallows D Waterswallows E Not Prequalified SK17
Active • 2024-25 (T-4)
13.33 MW
Plot A Land at Waterswallows Road, Buxton, SK17 7JT (3 components)
• 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
Reciprocating engines FPC ELECTRIC LAND LIMITED New Build Generating CMU Waterswallows A Waterswallows B +1 more Not Prequalified SK17
Active • 2024-25 (T-4)
19.04 MW
Plot A Land at Severn Road Avonmouth BS10 7SE (7 components)
• 10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Avonmouth Energy Park
• 25 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Avonmouth Energy Park
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Avonmouth Energy Park
Reciprocating engines FPC (Ipswich) Limited New Build Generating CMU Avonmouth (G) Avonmouth A +5 more BS10
Active • 2025-26 (T-4), 2024-25 (T-4) ...
142.55 MW
Plot 4 Hermitage Park, Harts Farm Way, Havant, PO9 1FA (2 components)
• 10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Hermitage Park
• A new build, gas fuelled generation station
Active • 2026-27 (T-4), 2025-26 (T-4)
38.13 MW
Plot 4 Hermitage Park, Harts Farm Way, Havant, PO91FA (2 components)
• 10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Hermitage Park
• A new build, gas fuelled generation station
Reciprocating engines EL (HAVANT) LIMITED New Build Generating CMU Harts Farm Havant PO9
Active • 2026-27 (T-4), 2025-26 (T-4)
19.04 MW
Plot 3, Forge Way, Knypersley, Staffordshire, ST8 7DN (2 components)

Knypersley Power will be a 7.012MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network

Reciprocating engines Knypersley Power Limited New Build Generating CMU Knypersley Power ST8
Active • 2028-29 (T-4), 2024-25 (T-4)
13.14 MW
PLOT 11, MID SUFFOLK BUSINESS PARK, EYE, IP23 7HU (1 component)

CMU consisting of a gas reciprocating engine and alternator

Active • 2024-25 (T-4)
2.41 MW
Phillips Lane, Colne, BB8 9PQ (5 components)

A gas fuelled generating station.

Reciprocating engines AVE 009 Limited New Build Generating CMU Philips Lane Philips Lane A +1 more Not Prequalified BB8
Active • 2024-25 (T-4), 2023-24 (T-4) ...
13.31 MW
Petre Road, Oakenshaw, Clayton-le-Moors, Hyndburn, Lancashire, England, BB5 5JB (2 components)

A Distribution Connected gas fueled generating station.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Clayton 1 Clayton 2 BB5
Active • 2028-29 (T-4)
14.96 MW
Petre Road, Clayton-le-Moors, Lancashire BB5 5JG (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines STOR 113 LTD New Build Generating CMU Clayton Clayton +1 more BB5
Active • 2024-25 (T-4), 2023-24 (T-4) ...
57.07 MW
Penamser Road, Porthmadog, Gwnyedd, LL49 9NX (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Porthmadog Not Prequalified LL49
Active • 2024-25 (T-4), 2021-22 (T-1)
4.76 MW
Park Road, Hollins, Dukinfield, Tameside, Greater Manchester SK16 5PT (2 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines STOR 123 Ltd New Build Generating CMU SK16
Active • 2028-29 (T-4)
14.96 MW
Park Road, Bacup, OL13 0BW (5 components)

A gas fuelled generating station.

Reciprocating engines AVE 008 Limited New Build Generating CMU Park Road Park Road A +1 more Not Prequalified OL13
Active • 2024-25 (T-4), 2023-24 (T-4) ...
13.31 MW
Pandora Business Park Greengate, Middleton, Manchester, M24 1RU (8 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-4) ...
31.71 MW
On land off Nairn Road, Deans Industrial Estate, Livingston, EH54 8AY (6 components)

A new build, gas fuelled generation station.

Reciprocating engines DRUMCROSS GENERATION LIMITED New Build Generating CMU Drumcross Generation Limited Drumcross Generation Limited +3 more EH54
Active • 2025-26 (T-4), 2024-25 (T-4) ...
94.65 MW
Old Littleton Road, Chertsey, TW17 9NU (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Chertsey Not Prequalified TW17
Active • 2026-27 (T-4), 2023-24 (T-1)
34.26 MW
Old Littleton Road, Chertsey, Surrey, TW17 9NU (5 components)
• A New Build gas generating station..
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Castle Bromwich Chertsey +2 more TW17
Active • 2028-29 (T-4), 2027-28 (T-4) ...
62.02 MW
Old Ively Road, Farnborough, Hampshire,GU14 0LX (1 component)

16 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Reciprocating engines WP GRID STORAGE 6 LIMITED New Build Generating CMU Farnborough Power Station Not Prequalified GU14
Active • 2027-28 (T-4)
14.91 MW
Old Ively Road, Farnborough, Hampshire, GU14 0LX (1 component)

16 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Active • 2027-28 (T-4)
14.91 MW
Old Church Lane, Billericay, CM13 1UP (5 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-1) ...
28.59 MW
OIL SITES ROAD, NYNAS REFINERY, ELLESMERE PORT, CHESHIRE WEST, CH65 4EF (5 components)

CMU consisting of a gas reciprocating engine and alternator

Active • 2024-25 (T-4), 2023-24 (T-4) ...
2.41 MW
Northumberland Road, Newburn, NE15 8SF (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
Reciprocating engines NEWBURN HAUGH POWER LIMITED New Build Generating CMU NEWBURN HAUGH Newburn Haugh Not Prequalified NE15
Active • 2024-25 (T-4), 2023-24 (T-4) ...
13.31 MW
North Road, Vauxhall, Ellesmere Port, CH65 1BA (2 components)

A new build, gas fuelled generation station

Reciprocating engines FORSA ENERGY (DRUMCROSS) HOLDINGS LIMITED New Build Generating CMU North Road North Road CH65
Active • 2028-29 (T-4), 2027-28 (T-4)
42.26 MW
Loading map...
Showing 25 locations