Reciprocating engines

517 unique locations (2569 components) - Page 5 of 21

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Rosper Road, Immingham, North Lincolnshire, DN40 3DZ (18 components) Geocoding Needed
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11434.68 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (1 component)

New build gas reciprocating multi-engine generating plant

Reciprocating engines VPI IMMINGHAM ENERGY PARK A LIMITED New Build Generating CMU VPI Energy Park A DN40
Active • 2024-25 (T-1)
47.08 MW
Rochester Power Generation Plant, Whitewall Road, Medway City Estate, Rochester, Kent, ME2 4DZ (9 components) Geocoding Needed
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating Engines Reciprocating engines CONRAD (ROCHESTER) LIMITED New Build Generating CMU Rochester Rochester +1 more ME2
Active • 2026-27 (T-4), 2025-26 (T-1) ...
25.02 MW
Road off Ffordd William Morgan, St Asaph, LL17 0LF (1 component) Geocoding Needed

Construction of a New Generating CMU comprising of gas fuelled reciprocating generation sets and gas delivery plant

Active • 2024-25 (T-4)
4.76 MW
Road off Ffordd William Morgan St Asaph LL17 0LF (1 component)

Construction of a New Generating CMU comprising of gas fuelled reciprocating generation sets and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU St. Asaph B Not Prequalified LL17
Active • 2024-25 (T-4)
Ribble Court, Red Scar Business Park, Preston, Lancashire, England, PR2 5LX (2 components) Geocoding Needed

A Distribution Connected gas fueled generating station.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Longridge 1 Longridge 2 PR2
Active • 2028-29 (T-4)
14.96 MW
Rhymney, STOR Gen Room, Unit 48, Portmanmoor Road Industrial Estate, Rover Way, Cardiff, CF24 5HB (4 components) Geocoding Needed
• Gas reciprocating engines
• Gas reciprocating engines as the generating unit.
Reciprocating engines ALKANE ENERGY UK LIMITED Refurbishing Generating CMU Rhymney CF24
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.50 MW
Rhymney STOR Gen Room Unit 48 Portmanmoor Road Industrial Estate Rover Way Cardiff CF24 5HB (2 components)

Gas reciprocating engines (2)

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU Rhymney Rhymney CF24
Active • 2028-29 (T-4), 2024-25 (T-4)
6.78 MW
Rhodesia Power Limited, Highgrounds Industrial Estate, Highgrounds road, Rhodesia, Worksop, S80 3AT (4 components) Geocoding Needed

The CMU component consist of gas fired reciprocating engines, organic rankine cycle turbines and stack gas-recovery carbon capture to be installed on designated land at Rhodesia Power Limited, Highgrounds Industrial …

Active • 2026-27 (T-4), 2025-26 (T-1) ...
37.82 MW
Rhodesia Power Limited, Highgrounds Industrial Estate Highgrounds road, Rhodesia, Worksop, S80 3AT (3 components)

The CMU component consist of gas fired reciprocating engines, organic rankine cycle turbines and stack gas-recovery carbon capture to be installed on designated land at Rhodesia Power Limited, Highgrounds Industrial … (3)

Reciprocating engines RHODESIA POWER LIMITED New Build Generating CMU Rhodesia Power Limited S80
Active • 2025-26 (T-1), 2024-25 (T-1) ...
28.30 MW
Redscar Business Park, Preston, PR2 5NJ (2 components) Geocoding Needed

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines STOR 122 Ltd New Build Generating CMU PR2
Active • 2028-29 (T-4)
14.96 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (11 components) Geocoding Needed
• Battery Storage Station
• Gas reciprocating engines as the generating unit.
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
174.30 MW
Rectory Field, Cards Road, Sandon, CM2 7AE (6 components) Geocoding Needed
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
45.95 MW
Rear Grazing Land, Crescent Industrial Estate, Station Road, Southampton, Hampshire, SO16 0YD (3 components) Geocoding Needed

20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Reciprocating engines Nursling Power Limited New Build Generating CMU Nursling Power Nursling Power SO16
Active • 2024-25 (T-4), 2023-24 (T-4) ...
37.66 MW
Rassau Industrial Estate, Ebbw Vale, South Wales, NP23 5SD (15 components) Geocoding Needed
• 16MW Power plant comprising 8x2MW gas reciprocating engines.The Power plant is connected to the local distribution and gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• 16MW Power plant comprising reciprocating engines.The Power plant is connected to the local distribution and gas network.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) OGMORE POWER LIMITED Existing Generating CMU Ogmore Power Ogmore Power +7 more NP23
Active • 2028-29 (T-4), 2027-28 (T-4) ...
134.74 MW
Radstone Rd, Radstone, Brackley NN13 5PY (5 components) Geocoding Needed
• A new build diesel or gas grid support plant
• An Existing diesel grid support plant
• An Exiting diesel grid support plant
Reciprocating engines OCGT and Reciprocating Engines HALL FARM ENERGY LIMITED Existing Generating CMU Hall Farm Hall Farm +2 more NN13
Active • 2025-26 (T-1), 2024-25 (T-1) ...
18.88 MW
QinetiQ Portsdown Technology Park, Southwick Rd, Portsmouth, PO6 3RU (1 component) Geocoding Needed

20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Reciprocating engines WP GRID STORAGE 5 LIMITED New Build Generating CMU Portsdown Power station Not Prequalified PO6
Active • 2027-28 (T-4)
18.68 MW
Pye Bridge Industrial Estate, Somercotes, Alfreton, DE55 4NX (9 components) Geocoding Needed
• Additional reciprocating gas engines running on natural gas returned to service
• Reciprocating gas engines running on natural gas
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) PYEBRIDGE POWER LTD Existing Generating CMU Gas Generation Pye Bridge Gas Generation Pye Bridge +4 more DE55
Active • 2027-28 (T-4), 2026-27 (T-4) ...
45.90 MW
Pye Bridge Industrial Estate, Pye Bridge, Somercotes, Alfreton DE55 4NX (2 components) Geocoding Needed

Gas fired peaking power plant

Active • 2028-29 (T-4), 2025-26 (T-1)
14.56 MW
Prowse's Lane, Axbridge, BS26 2HP. (3 components) Geocoding Needed

Total installed capacity is 6.9MW gas reciprocating engines to be installed on designated land within a compound.

Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU Axbridge Axbridge +1 more BS26
Active • 2025-26 (T-4), 2024-25 (T-1) ...
19.66 MW
Prince of Wales Energy Park, Land off Skinner Lane, Pontefract, WF8 1HG (2 components) Geocoding Needed

Gas reciprocating engines

Active • 2025-26 (T-4), 2024-25 (T-1)
3.38 MW
Prince of Wales Energy Park Land off Skinner Lane Pontefract WF8 1HG (1 component)

Gas reciprocating engines

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU CMM Portfolio WF8
Active • 2024-25 (T-1)
0.47 MW
President Way, Luton, LU2 9NW (1 component) Geocoding Needed

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Luton Airport Not Prequalified LU2
Active • 2025-26 (T-4)
6.87 MW
Poole Bank Nurseries, Common Lane, Welton, Hull, HU15 1UT (11 components) Geocoding Needed
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
11.03 MW
Loading map...
Showing 25 locations