Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

1208 unique locations (4420 components) - Page 4 of 49

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Unit 28, 29, 30, Peel Mills Industrial Estate, Chamberhall Street, Bury BL9 0LU (7 components) Geocoding Needed
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 16 MW power plant comprising 8x2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
44.92 MW
Unit 27A Aber park, Aber Road, Flint, CH6 5EX (7 components) Geocoding Needed
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
14.22 MW
Unit 27A Aber park Aber Road Flint CH6 5EX (3 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating engines CONRAD (FLINT) LIMITED New Build Generating CMU Flint Flint +1 more CH6
Inactive • 2022-23 (T-1), 2020-21 (T-1) ...
Unit 27A Aber park, Aber Road, Flint, CH6 5EP (7 components) Geocoding Needed
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
9.47 MW
Unit 27A Aber park Aber Road Flint CH6 5EP (4 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating engines CONRAD (FLINT) LIMITED New Build Generating CMU Flint B Flint B +2 more CH6
Inactive • 2022-23 (T-1), 2021-22 (T-1) ...
Unit 26-30 North Bank, Berry Hill Industrial Estate, Droitwich Spa, WR9 9AU (1 component) Geocoding Needed

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Reciprocating engines DROITWICH PEAK ENERGY LIMITED New Build Generating CMU Droitwich WR9
Active • 2024-25 (T-4)
4.76 MW
Unit 2, 105 Abercorn Street, Paisley, PA3 4AT (12 components) Geocoding Needed
• New build gas generator
• Operational reciprocating gas engines
Active • 2028-29 (T-4), 2027-28 (T-4) ...
30.35 MW
Unit 1 Lanes Farm, Marlborough Road, Royal Wootton Bassett, Swindon, SN4 7SA (9 components) Geocoding Needed

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-4) ...
31.89 MW
Unit 1 Lanes Farm Marlborough Road Royal Wootton Bassett Swindon SN4 7SA (5 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Reciprocating engines CONRAD (WOOTTON) LIMITED New Build Generating CMU Wootton Wootton +3 more SN4
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
6.19 MW
Unit 1b Newhouse Road, Huncoat, Accrington, BB5 6NT (3 components) Geocoding Needed

New build gas generator

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
11.36 MW
Unit 1b Newhouse Road Huncoat Accrington BB5 6NT (2 components)

New build gas generator (2)

Reciprocating engines TGC EMERALD LIMITED New Build Generating CMU Newhouse Road Newhouse Road BB5
Inactive • 2019-20 (T-1), 2017-18 (T-1)
Unit 1B Britannia Business Park, Union Road BL2 2HP (1 component) Geocoding Needed

Gas reciprocating engine(s)

Reciprocating engines ALKANE ENERGY UK LIMITED New Build Generating CMU Union Road Rejected BL2
Inactive • 2022-23 (T-4)
5.42 MW
Unit 19, Lowther Road, Clay Flatts Industrial Estate, Workington, CA14 2TQ (3 components) Geocoding Needed

New build gas generator

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
11.36 MW
Unit 19 Lowther Road Clay Flatts Industrial Estate Workington CA14 2TQ (2 components)

New build gas generator (2)

Reciprocating engines TGC EMERALD LIMITED New Build Generating CMU Clay Flatts Clay Flatts CA14
Inactive • 2019-20 (T-1), 2017-18 (T-1)
Unit 1-3, 135A Business Park, Armoury Road, Small Heath, Birmingham, B11 2RQ (1 component) Geocoding Needed

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Reciprocating engines SWB Power Ltd New Build Generating CMU ARMOURY ROAD Conditional B11
Inactive • 2022-23 (T-4)
7.14 MW
Union Street, Manchester, M27 4HL (4 components) Geocoding Needed

A gas fuelled generating station.

Reciprocating engines AVE 004 Limited New Build Generating CMU Union Street A Union Street B Not Prequalified M27
Inactive • 2023-24 (T-4), 2022-23 (T-3)
6.65 MW
Tweed Road, Northampton, NN5 5AJ (1 component) Geocoding Needed

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Reciprocating engines Balance Energy 5 Ltd New Build Generating CMU Ellesmere Avenue Not Prequalified NN5
Active • 2024-25 (T-4)
5.29 MW
Tweedale Way, Oldham OL9 8EH (4 components) Geocoding Needed

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO 2) LIMITED New Build Generating CMU Scholes Power OL9
Active • 2025-26 (T-4), 2024-25 (T-1) ...
10.81 MW
Trumps Farm Landfill Site, Kitsmead Lane, Chertsey, Surrey, KT16 0DS (3 components) Geocoding Needed
• 2 gas reciprocating engines rated at approximately 1MW each. All associated gas delivery equipment and switchgear is included. The generating units are connected top the distribution network.
• Gas fired reciprocating engines
Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
6.66 MW
Trumps Farm Landfill Site Kitsmead Lane Chertsey Surrey KT16 0DS (2 components)
• 2 gas reciprocating engines rated at approximately 1MW each. All associated gas delivery equipment and switchgear is included. The generating units are connected top the distribution network.
• Gas fired reciprocating engines
Reciprocating engines INFINIS ALTERNATIVE ENERGIES LIMITED Existing Generating CMU OTGS17 OTGS17 KT16
Inactive • 2020-21 (T-1), 2019-20 (T-1)
Trumfleet Generation Site, Marsh Lane, Trumfleet, Doncaster. DN6 0DU (13 components) Geocoding Needed
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Diesel) UK POWER RESERVE LIMITED Existing Generating CMU Trumfleet Power Station Trumfleet Power Station +4 more DN6
Active • 2024-25 (T-4), 2023-24 (T-4) ...
4.82 MW
Tring Road, Tring, HP23 4RA (11 components) Geocoding Needed
• 10 x 1mw gas generator units to be installed on designated land at Tring Road - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• 20 x 1mw gas generator units to be installed on designated land at Tring Road - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• A gas fuelled generating station.
Reciprocating engines ARL 021 Limited New Build Generating CMU AR0123 Tring Road +4 more Conditional HP23
Active • 2025-26 (T-4), 2024-25 (T-4) ...
189.26 MW
Traston Road, Off Corporation Road, Newport, Gwent, NP19 4RQ (16 components) Geocoding Needed
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
81.43 MW
Traston Road, Off Corporation Road, Newport , Gwent, NP19 4RQ (16 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Solutia Power Station Solutia Power Station +9 more NP19
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.30 MW
Loading map...
Showing 25 locations