Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

923 unique locations (3984 components) - Page 3 of 37

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Applied Automation, Eastern Wood Road, Langage Industrial Estate, PL7 5ET (6 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
APS Growers Ltd / Branfield Nursery, 111 Stockbridge Road, Elloughton, HU15 1HW (14 components)
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a thermal output of 3.984 MW.
Reciprocating engines Combined Heat and Power (CHP) GLASS LEAF POWER LIMITED Branfield Energy Centre Glassleaf Power +2 more HU15
Active • 2029-30 (T-4), 2028-29 (T-4) ...
12.40 MW
Arlesey Landfill Site, Mill Lane, Arlesey, Bedfordshire, SG15 6RF (16 components)
• Gas reciprocating engines
• The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
14.23 MW
Arlesey Landfill Site, Mill Lane, Arlesey, Bedfordshire, SG15 6ZA (3 components)

The system comprises of two gas reciprocating engines provided an exported output of around 2MW.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Asher Lane, Ripley, Derbyshire, DE5 3RE (3 components)
• New reciprocating genset in acoustic enclosure
• New reciprocating engine in acoustic enclosure. *Post code and grid reference may not match because site address is not yet registered with post office. We have used nearest available post code.
Reciprocating engines FRP MERCIA HOLDCO LIMITED New Build Generating CMU Asher Lane 2 Asher Lane 2 +1 more Conditional DE5
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Ashland Cottage Farm, Beck Lane, Sutton in Ashfield, NG17 3AH (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines FISHPOND ENERGY LIMITED New Build Generating CMU Ashlands Ashlands +1 more NG17
Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.61 MW
Ash Road, Elton, Chester, CH2 4RX (6 components)

A new build, gas fuelled generation station.

Reciprocating engines MERSEY GENERATION LIMITED New Build Generating CMU Protos Generation - 1 Protos Generation - 2 +1 more CH2
Active • 2029-30 (T-4), 2028-29 (T-4)
92.29 MW
Ash Road, Protos, CH2 4LB (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Reciprocating engines UK Dynamic Reserve Limited New Build Generating CMU Conditional CH2
Inactive • 2022-23 (T-4)
Ash Road, Protos, CH2 4RX (1 component)

49.5 MW Gas Reciprocating Engines envisaged to be made up of multiple modules.

Reciprocating engines Peel L&P Energy Limited New Build Generating CMU Protos Balancing Services Plant Not Prequalified CH2
Active • 2024-25 (T-4)
Ashton Old Road, Openshaw, Manchester M11 1AA (5 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines ASHTON POWER LIMITED New Build Generating CMU Ashton Ashton +2 more M11
Active • 2024-25 (T-4), 2023-24 (T-4) ...
17.13 MW
Askern 1, CMM Generation, Campsall Road, Askern, Doncaster, DN6 0FD (2 components)

Gas generating unit(s)

Reciprocating engines REGENT PARK ENERGY LIMITED Regent Park - CMM Regent Park - CMM Rejected DN6
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Askern CMM Generation, Campsall Road, Askern, Doncaster, DN6 0FD (10 components)
• Gas fired generating unit(s)
• Gas fired reciprocating engines
• Gas reciprocating engine(s)
Active • 2025-26 (T-4), 2024-25 (T-1) ...
0.22 MW
Aspatria Business Park, Park Road, Aspatria, CA7 3DP (4 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Reciprocating engines SWB Power Ltd New Build Generating CMU ASPATRIA BP ASPATRIA BP +1 more Conditional CA7
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Aspatria Business Park, Park Road, Aspatria, Cumbria, CA7 3DP (2 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• New build power station comprised of multiple reciprocating engines
Reciprocating engines OCGT and Reciprocating Engines SWB Power Ltd New Build Generating CMU Aspatria BP Not Prequalified CA7
Active • 2024-25 (T-4), 2021-22 (T-4)
Attwood Road, Burntwood, WS7 3GF (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Reciprocating engines SWB Power Ltd New Build Generating CMU BURNTWOOD Conditional WS7
Inactive • 2022-23 (T-4)
Automated Processing Centre, Middle Bank, Doncaster DN4 5NE (3 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines STOR 102 Ltd New Build Generating CMU Hyde Hyde Conditional DN4
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Aveley Landfill Site, Sandy Lane, Aveley, RM15 4XP (19 components)
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
• Gas fired generating units
• Gas reciprocating engines
Active • 2029-30 (T-4), 2028-29 (T-4) ...
10.16 MW
Aveley (N), Sandy Lane, Aveley, South Ockendon, Essex, RM15 4XP (6 components)
• Gas fired generating unit
• The site comprises of four gas reciprocating engines with an assumed output of 4.6MW. The reciprocating engines are connected to the distribution network.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Balle Street, Darwen, Blackburn BB3 2AZ (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines STOR 130 LTD New Build Generating CMU Balle Balle +1 more Conditional BB3
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Ball's Hall, Montacute BA22 8SY (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Reciprocating engines SWB Power Ltd New Build Generating CMU MONTACUTE Conditional BA22
Inactive • 2022-23 (T-4)
Banbury Power, Hennef Way, Grimsbury, Banbury, OX16 3WA (2 components)

Banbury Power will be a 12MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 6MW …

Inactive • 2019-20 (T-1)
Bankside Industrial Estate, Middlefield, Glensburgh, Falkirk FK2 7XU (3 components)
• A new build gas fuelled generating station.
• The facility consists of a 19.9MW gas facility.
Reciprocating engines SPECTRUMRESERVE4 LTD New Build Generating CMU Bankside Industrial Estate FK2
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Batleys Cash and Carry, Gielgud Way, Coventry, CV2 2SZ (10 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Reciprocating engines PEAK GEN POWER LIMITED Peak Gen Power Coventry Peak Gen Power Coventry +2 more CV2
Active • 2029-30 (T-4), 2028-29 (T-4) ...
33.82 MW
Batleys Cash and Carry, Talbot Road, Fareham, PO15 5RY (10 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• The CMU component is net of the auxiliary power required
Active • 2029-30 (T-4), 2028-29 (T-4) ...
104.59 MW
Beale Valley Landfill, Royton, Rochdale, OL1 4LT (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
Loading map...
Showing 25 locations