Reciprocating engines

421 unique locations (2502 components) - Page 1 of 17

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
10-14 Birmingham Road, West Bromwich, B71 4LD (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25, 2021-22
1020 Slutchers Lane, Centre Park, Warrington, WA1 1QL (9 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Reciprocating engines WARRINGTON POWER LIMITED Existing Generating CMU Warrington Power Warrington Power +4 more WA1
Active • 2029-30, 2028-29 ...
59.31 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (18 components)
• 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
• 425MW of Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
Active • 2029-30, 2027-28 ...
488.49 MW
135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (5 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• CMU consisting of multiple reciprocating engines and alternators
Active • 2025-26, 2024-25 ...
1-3 Loicher Lane, Ecclesfield, Sheffield, S35 9XN (5 components)

Generating unit

Reciprocating engines ENEL X UK LIMITED Existing Generating CMU S35
Active • 2025-26
1A Elms Farm Industrial Estate, Edison Road, Bedford, Bedfordshire, MK41 0HU (14 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.

Active • 2029-30 (T-4), 2027-28 (T-4) ...
14.13 MW
1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD (4 components)
• AN 8MW new build gas generating station..
• CMU FES002 which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 8MW. The CMU is located at: 1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD.
• CMU FES003 which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 4MW. The CMU is located at: 1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD.
Active • 2026-27, 2024-25
7.14 MW
1 Maxwell Road, Woodston Industrial Estate, Peterborough, PE2 7JB (5 components)
• This CMU is 10*2MW reciprocating engines using HVO.
• This CMU is 10*2MW reciprocating engines.
• This CMU is 6*2MW reciprocating engines.
Reciprocating engines PEAK GEN POWER 2 LIMITED Peak Gen Power 2 Peak Gen Power 2 PE2
Active • 2027-28 (T-4), 2026-27 (T-4) ...
37.29 MW
23 Whittle Road, Ferndale Industrial Estate, Wimborne, BH21 7PW (4 components)

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO 2) LIMITED New Build Generating CMU Whittle Power BH21
Active • 2025-26, 2024-25 ...
9.61 MW
25 Rookwood Way, Haverhill, CB9 8PB (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26, 2024-25
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (28 components)
• New build gas generator
• Operational Reciprocating Engine
• Operational gas reciprocating engine.
Reciprocating engines OCGT and Reciprocating Engines GREENSPAN NIFTY FIFTY LIMITED Existing Generating CMU Wardpark Alpha Wardpark Alpha +14 more G67
Active • 2029-30, 2028-29 ...
30.08 MW
3 Nairn Road, Deans Industrial Estate, Livingston, West Lothian, EH54 8AY (8 components)
• Newbuild gas generator
• Operational gas generator
• Reciprocating engine (natural gas fuelled)
Reciprocating engines GNNR LTD New Build Generating CMU Nairn Road Arthur Nairn Road Betty EH54
Active • 2026-27, 2025-26 ...
25.03 MW
40 Gardiner Road, Edinburgh, Midlothian, EH4 3RN (1 component)

New build power station comprised of multiple reciprocating engines.

Active • 2025-26
46 Station Road Stokesley Middlesbrough TS9 7AA (10 components)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
• Gas CHP engines in commercial horticultural usage with no auxilliary load
Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP) JAN BEZEMER & SONS LIMITED FLEXITRICITY LIMITED New Build Generating CMU Cleveland Nurseries CHP Cleveland Nurseries Gas Engines +2 more TS9
Active • 2027-28, 2025-26 ...
12.34 MW
4 Chemistry Lane, Pentre, Deeside CH5 2DA, UK (2 components)

14MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Reciprocating engines CULVERY POWER LIMITED Existing Generating CMU Culvery Power Limited CH5
Active • 2029-30, 2028-29
25.64 MW
4 Chemistry Ln, Pentre, Deeside CH5 2DA, UK (4 components)

14MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Reciprocating engines CULVERY POWER LIMITED Existing Generating CMU Culvery Power Culvery Power Limited +2 more CH5
Active • 2027-28, 2026-27 ...
26.16 MW
4 Finway Road, Hemel Hempstead, HP2 7PT (13 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW

Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.48 MW
62 Marlborough Road Lancing Business Park Lancing BN15 8UF (2 components)

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Blenheim Power Not Prequalified BN15
Active • 2025-26 (T-4), 2022-23 (T-1)
7 COWLEY WAY, CREWE, CW1 6AE (4 components)

CMU consisting of multiple gas reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.42 MW
84 Bridge St, Wednesbury WS10 0AN (1 component)

New build power station comprised of multiple reciprocating engines

Reciprocating engines HARTREE SOLUTIONS (UK) LIMITED New Build Generating CMU Shield Bridge Not Prequalified WS10
Active • 2025-26 (T-4)
ABBOTSHAUGH RESERVE POWER FACILITY, ABBOTTS ROAD, FALKIRK, FK2 7XU (2 components)

Front of the meter 10 x 2MW Gas Reciprocating Engines installed to generate power and export to the local Distribution Network.

Reciprocating engines FLEXITRICITY LIMITED Existing Generating CMU FLEX163 FK2
Active • 2029-30 (T-4), 2025-26 (T-4)
17.01 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (17 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Aberdare Power Station Aberdare Power Station +9 more CF44
Active • 2029-30 (T-4), 2028-29 (T-4) ...
37.60 MW
Abercorn Street, Paisley, PA3 4DF (5 components)

A new build, gas fuelled generation station.

Reciprocating engines ABERCORN GENERATION LIMITED New Build Generating CMU Abercorn Road Abercorn Road +2 more PA3
Active • 2024-25 (T-4), 2023-24 (T-4) ...
19.04 MW
Adjacent to Seal Sand Bulk Storage Facility, Seal Sands, Stockton-on-Tees, Cleveland, TS2 1UB (12 components)
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
173.55 MW
Adsworth Road, Stockport, SK3 8LF (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Stockport Not Prequalified SK3
Active • 2024-25 (T-4), 2021-22 (T-1)
Loading map...
Showing 25 locations