Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

3 unique locations (14 components)

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Caxton Way, Dinnington, Rotherham, S25 3QE (5 components)
• A 10MW new build gas generating station..
• A 20MW new build gas generating station..
Reciprocating engines WALKER & SON (HAULIERS) LIMITED New Build Generating CMU DINNINGTON1 DINNINGTON2 +1 more S25
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Bentinck Generating Station, Mill Lane, Nottinghamshire NG17 9LJ (5 components)
• A 7.5MW new build gas generating station..
• An electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 4.5MW.
Active • 2027-28 (T-4), 2026-27 (T-1) ...
23.96 MW
1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD (4 components)
• AN 8MW new build gas generating station..
• CMU FES002 which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 8MW. The CMU is located at: 1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD.
• CMU FES003 which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 4MW. The CMU is located at: 1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD.
Active • 2026-27 (T-4), 2024-25 (T-4)
7.14 MW
Loading map...
Showing 3 locations