Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

112 unique locations (944 components) - Page 1 of 5

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
1A Elms Farm Industrial Estate, Edison Road, Bedford, Bedfordshire, MK41 0HU (14 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.

Active • 2029-30 (T-4), 2027-28 (T-4) ...
14.13 MW
1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD (4 components)
• AN 8MW new build gas generating station..
• CMU FES002 which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 8MW. The CMU is located at: 1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD.
• CMU FES003 which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 4MW. The CMU is located at: 1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD.
Active • 2026-27 (T-4), 2024-25 (T-4)
7.14 MW
1 Maxwell Road, Woodston Industrial Estate, Peterborough PE2 7JB (5 components)
Reciprocating engines PEAK GEN POWER 2 LIMITED Refurbishing Generating CMU Peak Gen Power 2 PE2
Active • 2027-28 (T-4), 2026-27 (T-4) ...
37.29 MW
1 Maxwell Road, Woodston Industrial Estate, Peterborough, PE2 7JB (5 components)
• This CMU is 10*2MW reciprocating engines using HVO.
• This CMU is 10*2MW reciprocating engines.
• This CMU is 6*2MW reciprocating engines.
Reciprocating engines PEAK GEN POWER 2 LIMITED Peak Gen Power 2 Peak Gen Power 2 PE2
Active • 2027-28 (T-4), 2026-27 (T-4) ...
37.29 MW
3 Nairn Road, Deans Industrial Estate, Livingston, West Lothian, EH54 8AY (8 components)
• Newbuild gas generator
• Operational gas generator
• Reciprocating engine (natural gas fuelled)
Reciprocating engines GNNR LTD New Build Generating CMU Nairn Road Arthur Nairn Road Betty EH54
Active • 2026-27 (T-4), 2025-26 (T-1) ...
25.03 MW
4 Chemistry Ln, Pentre, Deeside CH5 2DA, UK (4 components)

14MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Reciprocating engines CULVERY POWER LIMITED Existing Generating CMU Culvery Power Culvery Power Limited +2 more CH5
Active • 2027-28 (T-4), 2026-27 (T-4) ...
26.16 MW
9.48 MW
4 Finway Road, Hemel Hempstead, HP2 7PT (13 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW

Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.48 MW
Alne Material Recovery Facility, Forest Lane, Alne, York, YO61 1TU (8 components)
• Existing Generating CMU comprising of a gas fuelled reciprocating engine and gas delivery plant.
• Generating CMU comprising of a CHP asset producing energy from waste
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
Energy from Waste Reciprocating engines ALLIUM HELMSLEY LTD New Build Generating CMU Alne Alne +4 more YO61
Active • 2026-27 (T-4), 2026-27 (T-1) ...
9.54 MW
Bentinck Generating Station, Mill Lane, Nottinghamshire NG17 9LG (2 components)

A 7.5MW new build gas generating station..

Reciprocating engines WALKER & SON (HAULIERS) LIMITED New Build Generating CMU FERRY1 FERRY1 NG17
Active • 2026-27 (T-4), 2025-26 (T-1)
14.15 MW
Booth Lane Sandbach Cheshire CW11 3PY (3 components)
• A 25.000MW gas fueled distribution connected generating station
• A gas fueled distribution connected generating station
• A new build gas fuelled generating station.
Reciprocating engines SEDG (MINERS) LTD New Build Generating CMU Booth Lane Not Prequalified CW11
Active • 2029-30 (T-4), 2028-29 (T-4) ...
89.44 MW
Booth Lane, Sandbach, Cheshire, CW11 3PY (3 components)

A new build gas fuelled generating station.

Active • 2029-30 (T-4), 2028-29 (T-4) ...
89.44 MW
Briar Chemicals, Sweet Briar Road, Norwich, NR6 5AP (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Norwich Norwich +1 more Not Prequalified NR6
Active • 2027-28 (T-4), 2026-27 (T-4) ...
22.78 MW
Bridge Street, Stalybridge, SK15 1PH (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (CHP) LIMITED New Build Generating CMU Not Prequalified SK15
Active • 2026-27 (T-4)
1.43 MW
Bridge Street, Stalybridge, SK15 1PH (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2026-27 (T-4)
1.43 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (31 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
• Back up generation
Active • 2026-27 (T-4), 2025-26 (T-4) ...
17.78 MW
11.65 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (24 components)

1 * 1.7MW diesel reciprocating engine (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
11.65 MW
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (15 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Cantelo Power Station Cantelo Power Station +2 more TA3
Active • 2029-30 (T-4), 2027-28 (T-4) ...
25.58 MW
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset., TA3 6RX (10 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
16.87 MW
Cps House, Stephenson Road, Severalls Industrial Park, Colchester, CO4 9QR (3 components)

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO 2) LIMITED New Build Generating CMU Stephenson Power Stephenson Power Not Prequalified CO4
Active • 2026-27 (T-4), 2025-26 (T-4) ...
11.57 MW
Dig Gate Lane, Rochdale, OL16 4NR (3 components)

4.4MW gas fired peaking power plant

Reciprocating engines ROCHDALE POWER LTD New Build Generating CMU ROCH01 ROCH01 Not Prequalified OL16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.45 MW
Loading map...
Showing 25 locations