Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

19 unique locations (199 components)

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
1 Maxwell Road, Woodston Industrial Estate, Peterborough PE2 7JB (5 components)
Reciprocating engines PEAK GEN POWER 2 LIMITED Refurbishing Generating CMU Peak Gen Power 2 PE2
Active • 2027-28 (T-4), 2026-27 (T-4) ...
37.29 MW
1 Maxwell Road, Woodston Industrial Estate, Peterborough, PE2 7JB (5 components)
• This CMU is 10*2MW reciprocating engines using HVO.
• This CMU is 10*2MW reciprocating engines.
• This CMU is 6*2MW reciprocating engines.
Reciprocating engines PEAK GEN POWER 2 LIMITED Peak Gen Power 2 Peak Gen Power 2 PE2
Active • 2027-28 (T-4), 2026-27 (T-4) ...
37.29 MW
Alne Material Recovery Facility, Forest Lane, Alne, York, YO61 1TU (8 components)
• Existing Generating CMU comprising of a gas fuelled reciprocating engine and gas delivery plant.
• Generating CMU comprising of a CHP asset producing energy from waste
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
Energy from Waste Reciprocating engines ALLIUM HELMSLEY LTD New Build Generating CMU Alne Alne +4 more YO61
Active • 2026-27 (T-4), 2026-27 (T-1) ...
9.54 MW
Bentinck Generating Station, Mill Lane, Nottinghamshire NG17 9LJ (5 components)
• A 7.5MW new build gas generating station..
• An electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 4.5MW.
Active • 2027-28 (T-4), 2026-27 (T-1) ...
23.96 MW
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (13 components)
Reciprocating engines Open Cycle Gas Turbine (OCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_CHEGT1 CMU_CHEGT1 +2 more CH65
Active • 2029-30 (T-4), 2028-29 (T-4) ...
287.68 MW
Cheshire Power Station, North Road, Ellesmere Port, South Wirral, CH65 1AF (13 components)
• Modular reciprocating engines
• One (1) Open Cycle Gas Turbine
• One (1) Open Cycle Gas Turbine MSID: 7382
Active • 2029-30 (T-4), 2028-29 (T-4) ...
287.68 MW
Deeside Power Station, Zone 4 Weybridge Road, Deeside Industrial Park, Flintshire, CH5 2UL (3 components)
• Gas Reciprocating Engines
• Grid Scale Battery Energy Storage.
Active • 2028-29 (T-4), 2026-27 (T-1)
100.29 MW
Dewi Road, Tregaron, SY25 6JP (3 components)

STOR diesel engines that will operate environmentally with mixed fuel

Reciprocating engines GFI TREGARON LTD Existing Generating CMU Tregaron SY25
Active • 2026-27 (T-1), 2025-26 (T-1) ...
18.48 MW
Ellifoot Lane, Burstwick, HU12 9EB (7 components)
• A Distribution Connected 4.4MW gas fueled generating station
• A Distribution Connected 4.5MW gas fueled generating station
• a Combined Heat and Power Plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
34.29 MW
Hoon Hay Manor, Marston Lane, Hatton, Derby, DE65 5EA (19 components)
• Reciprocating engines
• Reciprocating genset
Reciprocating engines FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Hatton Hatton +1 more DE65
Active • 2028-29 (T-4), 2027-28 (T-4) ...
16.63 MW
Land And Buildings On The North East Side Of Tame Street, Stalybridge, SK15 1QF (5 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• CMU consisting of multiple reciprocating engines and alternators
Active • 2029-30 (T-4), 2026-27 (T-1) ...
8.30 MW
Land at Fordbridge Lane, Blackwell, DE55 5JY (31 components)
• 20 MWs of multiple reciprocating generator units to be installed on designated land at Fordbridge Lane, Blackwell.
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
• 20 MWs of reciprocating engine generation connecting into existing 33kv substation
Active • 2027-28 (T-4), 2026-27 (T-4) ...
26.55 MW
Land at Fordbridge Lane, Blackwell, DE55 5JY. (31 components)
• 20 MWs of multiple reciprocating generator units to be installed on designated land at Fordbridge Lane, Blackwell.
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
• 20 MWs of reciprocating engine generation connecting into existing 33kv substation
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Fordbridge Lane Fordbridge Lane +1 more DE55
Active • 2027-28 (T-4), 2026-27 (T-4) ...
26.55 MW
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL (13 components)

Battery Storage Plant (2)

Reciprocating engines Storage (Duration 2h) Open Cycle Gas Turbine (OCGT) THURROCK STORAGE LIMITED New Build Generating CMU Thurrock Storage Limited Thurrock Storage Limited +2 more RM18
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1089.05 MW
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (13 components)
• Battery Storage Plant
• Battery Storage plant
• Gas reciprocating engines
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1089.05 MW
Radstone Rd, Radstone, Brackley NN13 5PY (6 components)
• A new build diesel or gas grid support plant
• An Existing diesel grid support plant
• An Exiting diesel grid support plant
Reciprocating engines OCGT and Reciprocating Engines HALL FARM ENERGY LIMITED Existing Generating CMU Hall Farm Hall Farm +2 more NN13
Active • 2026-27 (T-1), 2025-26 (T-1) ...
14.04 MW
Rectory Field, Cards Road, Sandon, CM2 7AE (7 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
46.26 MW
The Manorway, Stanford-le-Hope, SS17 9LL (9 components)
• A Battery Energy Storage System (2)
• Reciprocating engines of 6 mW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
13.94 MW
Loading map...
Showing 19 locations