Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

173 unique locations (986 components) - Page 1 of 7

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (18 components)
• 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
• 425MW of Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
Reciprocating engines Storage (Duration 2h) Storage (Duration 5h) Combined Cycle Gas Turbine (CCGT) CARRINGTON STORAGE LIMITED CARLTON ENERGY NO: 5 LIMITED New Build Generating CMU Trafford Power Battery Storage Unit 1 Trafford Power Battery Storage Unit 1 +15 more M31
Active • 2029-30 (T-4), 2027-28 (T-4) ...
488.49 MW
135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (5 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• CMU consisting of multiple reciprocating engines and alternators
Active • 2025-26 (T-4), 2024-25 (T-4) ...
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (5 components)
Reciprocating engines Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Glowhouse Power Not Prequalified PR26
Active • 2025-26 (T-4), 2024-25 (T-4) ...
1-3 Loicher Lane, Ecclesfield, Sheffield, S35 9XN (5 components)

Generating unit

Reciprocating engines ENEL X UK LIMITED Existing Generating CMU S35
Active • 2025-26 (T-4)
23 Whittle Road, Ferndale Industrial Estate, Wimborne, BH21 7PW (4 components)

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO 2) LIMITED New Build Generating CMU Whittle Power BH21
Active • 2025-26 (T-4), 2024-25 (T-1) ...
9.61 MW
25 Rookwood Way, Haverhill CB9 8PB (2 components)
Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Haverhill Not Prequalified CB9
Active • 2025-26 (T-4), 2024-25 (T-4)
25 Rookwood Way, Haverhill, CB9 8PB (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4), 2024-25 (T-4)
40 Gardiner Road, Edinburgh, Midlothian, EH4 3RN (1 component)

New build power station comprised of multiple reciprocating engines.

Reciprocating engines HARTREE SOLUTIONS (UK) LIMITED New Build Generating CMU MOWI Not Prequalified EH4
Active • 2025-26 (T-4)
46 Station Road Stokesley Middlesbrough TS9 7AA (10 components)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
• Gas CHP engines in commercial horticultural usage with no auxilliary load
Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED JAN BEZEMER & SONS LIMITED New Build Generating CMU Cleveland Nurseries CHP Cleveland Nurseries Gas Engines +2 more TS9
Active • 2027-28 (T-4), 2025-26 (T-4) ...
12.34 MW
4 Chemistry Ln, Pentre, Deeside CH5 2DA, UK (4 components)

14MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Reciprocating engines CULVERY POWER LIMITED Existing Generating CMU Culvery Power Culvery Power Limited +2 more CH5
Active • 2027-28 (T-4), 2026-27 (T-4) ...
26.16 MW
9.48 MW
4 Finway Road, Hemel Hempstead, HP2 7PT (13 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW

Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.48 MW
62 Marlborough Road Lancing Business Park Lancing BN15 8UF (2 components)

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Blenheim Power Not Prequalified BN15
Active • 2025-26 (T-4), 2022-23 (T-1)
84 Bridge St, Wednesbury WS10 0AN (1 component)

New build power station comprised of multiple reciprocating engines

Reciprocating engines HARTREE SOLUTIONS (UK) LIMITED New Build Generating CMU Shield Bridge Not Prequalified WS10
Active • 2025-26 (T-4)
ABBOTSHAUGH RESERVE POWER FACILITY, ABBOTTS ROAD, FALKIRK, FK2 7XU (2 components)

Front of the meter 10 x 2MW Gas Reciprocating Engines installed to generate power and export to the local Distribution Network.

Reciprocating engines FLEXITRICITY LIMITED Existing Generating CMU FLEX163 FK2
Active • 2029-30 (T-4), 2025-26 (T-4)
17.01 MW
Askern CMM Generation Campsall Road Askern Doncaster DN6 0FD (10 components)
Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU Askern DN6
Active • 2025-26 (T-4), 2024-25 (T-1) ...
0.22 MW
Askern CMM Generation, Campsall Road, Askern, Doncaster, DN6 0FD (10 components)
• Gas fired generating unit(s)
• Gas fired reciprocating engines
• Gas reciprocating engine(s)
Active • 2025-26 (T-4), 2024-25 (T-1) ...
0.22 MW
Belvedere Lane, Milton Keynes, MK17 9JH (2 components)
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 8MW for a 1 hour duration installed on designated land within a compound at Belvedere Nurseries
Reciprocating engines Storage (Duration 1h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Belvedere A Belvedere B Not Prequalified MK17
Active • 2025-26 (T-4)
Bevercotes Energy Park, West Drayton Avenue, Bevercotes, Nottinghamshire, DN22 8DB (4 components)
• 3 x 1MW / 1.2 MWh BYD Lithium Ion Battery
• Gas reciprocating engines
Reciprocating engines ALKANE ENERGY UK LIMITED New Build Generating CMU Rejected DN22
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Bones lane, Cheddleton, Leek, Staffordshire, ST13 7BT (6 components)

1.9 MW Gas gen ENER-G 1999

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Boot Lane, Sandbach, Cheshire CW11 3PY (2 components)
• 20MW of Battery Energy Storage Systems
• 26.000MW of Reciprocating Engines
Active • 2025-26 (T-4)
Loading map...
Showing 25 locations