Reciprocating engines

3 unique locations (22 components)

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Scawby Brook, Brigg, Lincolnshire DN20 9LT (9 components)
• A Prospective New Build Gas reciprocating energy reserve facility
• Brigg Battery 2 hour duration
• Brigg Battery 2 hour duration. Lower Connection Capacity takes in to account degradation of capacity in year 6 of operation.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
30.29 MW
Scawby Brook, Scawby, Brigg, DN20 9LT. (4 components)

Brigg Gas Peaker

Reciprocating engines CENTRICA DISTRIBUTED GENERATION LIMITED New Build Generating CMU 8RESAK 8RESAK DN20
Active • 2026-27 (T-4), 2025-26 (T-4) ...
135.85 MW