Reciprocating engines

383 unique locations (1343 components) - Page 1 of 16

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (29 components) Geocoding Needed
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
β€’ The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
β€’ The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Storage Reciprocating engines Storage (Duration 1h) OCGT and Reciprocating Engines (Fuel Type - Diesel) UK POWER RESERVE LIMITED Existing Generating CMU Asfordby 1 Power Station Asfordby 1 Power Station +12 more LE14
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
43.67 MW
Winterton Landfill Site, Coleby Road, West Halton, Winterton, Lincolnshire, DN15 9UP (1 component) Geocoding Needed

The site comprises of gas reciprocating unit(s)

Reciprocating engines INFINIS ALTERNATIVE ENERGIES LIMITED New Build Generating CMU Conditional DN15
Inactive β€’ 2022-23 (T-4)
2.17 MW
Wincham Lane, Wincham, Northwich, CW9 6DE (9 components) Geocoding Needed

New build power station comprised of multiple reciprocating engines.

Reciprocating engines Wincham Lane Power Limited New Build Generating CMU WINCHAM WINCHAM +3 more CW9
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
138.07 MW
Willow Holme Road, Carlisle, CA3 9PF (1 component) Geocoding Needed

Gas fired reciprocating engines.

Reciprocating engines Dockside Power Limited New Build Generating CMU Conditional CA3
Inactive β€’ 2022-23 (T-4)
19.03 MW
Willow Farm, Doncaster Road, Tadcaster, LS24 9PA (2 components) Geocoding Needed

New build power station comprised of multiple reciprocating engines.

Inactive β€’ 2022-23 (T-4), 2019-20 (T-1)
12.37 MW
Whitwell Energy Park, Southfield Lane, Whitwell, Derbys S80 3LH (7 components) Geocoding Needed
β€’ Gas reciprocating engines
β€’ Reciprocating engines
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
12.27 MW
Wheldale 2, Wheldale Road, Castleford, West Yorkshire, WF10 2RT (2 components) Geocoding Needed

Gas reciprocating engines

Inactive β€’ 2022-23 (T-4), 2019-20 (T-1)
11.87 MW
Whaley Road, Barnsley, S75 1HT (1 component) Geocoding Needed

The CMU Component will be made up of gas fired engines.

Reciprocating engines EC PROJECT 2 LIMITED New Build Generating CMU Barugh2 Conditional S75
Inactive β€’ 2022-23 (T-4)
14.27 MW
West Road North, Cross Green, Leeds, West Yorkshire, LS10 1RR (2 components) Geocoding Needed
β€’ Gas engines in a peaking plant environment
β€’ New gas engines in a peaking plant environment, servicing power generation and DSR.
Reciprocating engines OCGT and Reciprocating Engines FLEXITRICITY LIMITED New Build Generating CMU FLEX52 FLEX52 Conditional LS10
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4)
94.03 MW
Weighbridge Rd, Deeside CH5 2LL, UK (1 component) Geocoding Needed

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Reciprocating engines URBAN RESERVE LIMITED New Build Generating CMU Rejected CH5
Inactive β€’ 2022-23 (T-4)
1.90 MW
Waun y Pound Industrial Estate, Ebbw Vale, South Wales, NP23 6PL (10 components) Geocoding Needed
β€’ 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution network and WWU gas network.
β€’ 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the WPD distribution network and WWU gas network.
β€’ 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution and gas networks.
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
60.09 MW
Watling Road, Bishop Auckland, DL14 9AS (2 components) Geocoding Needed

New build power station comprised of multiple reciprocating engines.

Inactive β€’ 2022-23 (T-4), 2019-20 (T-1)
7.61 MW
Water Treatment Plant & Premises, Land to the south of Rumer Hill Road, Cannock WS11 8EX (2 components) Geocoding Needed
β€’ Gas fired generating unit(s)
β€’ Gas fired generating units
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4)
9.31 MW
Waterswallows Lane, Buxton, Derbyshire SK17 7JD (4 components) Geocoding Needed

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines STOR 119 Ltd New Build Generating CMU Waterswallows Waterswallows +1 more Conditional SK17
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
57.07 MW
Water Orton, Birmingham, B46 1NU (2 components) Geocoding Needed

Gas fired reciprocating engines.

Reciprocating engines Dockside Power Limited New Build Generating CMU Conditional B46
Inactive β€’ 2022-23 (T-4)
39.29 MW
Warsop Energy Park, Carter Lane, Warsop Vale, NG20 8XG (15 components) Geocoding Needed
β€’ 1 x MWM TBG2016 engine 1.35MW
β€’ Gas fired generating unit
β€’ Gas reciprocating engines
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
26.37 MW
Warren Park Way, Enderby, Leicester, LE19 4SA (4 components) Geocoding Needed
β€’ A gas fuelled electrical power generating unit comprising multiple reciprocating engines
β€’ A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
β€’ A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Reciprocating engines ENDERBY POWER LTD New Build Generating CMU ENDERBY2 Enderby +1 more Conditional LE19
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
15.75 MW
Warren House Farm, Rossington, DN11 0HP (2 components) Geocoding Needed

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Reciprocating engines UK Dynamic Reserve Limited New Build Generating CMU Conditional DN11
Inactive β€’ 2022-23 (T-4)
19.03 MW
Vause Farm, Town Ln, Charnock Richard, Chorley PR7 5HQ (3 components) Geocoding Needed
β€’ New build 10no. twin gas generators with 10no. transformers, switchgear and ancillary requirements.
β€’ New build 9no. twin gas generators with 9no. transformers, switchgear and ancillary requirements.
Reciprocating engines FLEXITRICITY LIMITED New Build Generating CMU Conditional PR7
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
34.22 MW
Units A1-4, 730 London Road, West Thurrock RM20 3NL (1 component) Geocoding Needed

20 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Reciprocating engines Purfleet Power Limited New Build Generating CMU Purfleet Power Conditional RM20
Inactive β€’ 2022-23 (T-4)
18.84 MW
Units 13 and 14, Ashmount Business Park, Upper Forest Way, Swansea Enterprise Park, Swansea, SA6 8QR (1 component) Geocoding Needed

14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Reciprocating engines Tay Power Limited New Build Generating CMU Tay Power Limited Conditional SA6
Inactive β€’ 2022-23 (T-4)
13.13 MW
Units 1-11, 16 and 17 Sandhurst, Kings Road, Canvey Island (1 component) Geocoding Needed

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Reciprocating engines URBAN RESERVE LIMITED New Build Generating CMU Rejected
Inactive β€’ 2022-23 (T-4)
1.90 MW
Unit J1 Aven Industrial Park, Tickhill Road, Maltby, Rotherham, S66 7QR (3 components) Geocoding Needed

Gas fired generating sets

Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
14.82 MW
Unit D, Kendale Road, Scunthorpe, DN16 1DT (11 components) Geocoding Needed

New build power station comprised of multiple reciprocating engines.

Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
121.70 MW
Loading map...
Showing 25 locations