Reciprocating engines

6 unique locations (14 components)

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
West Road North, Cross Green, Leeds, West Yorkshire, LS10 1RR (2 components) Geocoding Needed
β€’ Gas engines in a peaking plant environment
β€’ New gas engines in a peaking plant environment, servicing power generation and DSR.
Reciprocating engines OCGT and Reciprocating Engines FLEXITRICITY LIMITED New Build Generating CMU FLEX52 FLEX52 Conditional LS10
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4)
94.03 MW
Vause Farm, Town Ln, Charnock Richard, Chorley PR7 5HQ (3 components) Geocoding Needed
β€’ New build 10no. twin gas generators with 10no. transformers, switchgear and ancillary requirements.
β€’ New build 9no. twin gas generators with 9no. transformers, switchgear and ancillary requirements.
Reciprocating engines FLEXITRICITY LIMITED New Build Generating CMU Conditional PR7
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
34.22 MW
Unit 2 Northside, Freightliner Road, Brighton Road Industrial Estate, Hull HU3 4UW (1 component) Geocoding Needed

10 x 2MW new recip gas engines in a peaking plant environment, with a planned 15+ year lifespan. The installation and O&M put in place will meet the extended years …

Reciprocating engines FLEXITRICITY LIMITED New Build Generating CMU Conditional HU3
Inactive β€’ 2022-23 (T-4)
19.03 MW
Land off Station lane, Monkton Mains, Wormald Green, Harrogate HG3 3QA (3 components) Geocoding Needed

10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements

Reciprocating engines FLEXITRICITY LIMITED New Build Generating CMU Conditional HG3
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
38.02 MW
Glebe Farm, Grunters Grange, East Keal, Spilsby Lincs PE23 4AY (3 components) Geocoding Needed

10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements

Reciprocating engines FLEXITRICITY LIMITED New Build Generating CMU Conditional PE23
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
38.02 MW
A19 Business Park (Riccall Business Park), Riccall, North Yorkshire YO19 6QR (2 components) Geocoding Needed

Gas generation peaking plant comprising of 9 x 2MW engines

Reciprocating engines OCGT and Reciprocating Engines FLEXITRICITY LIMITED New Build Generating CMU FLEX51 FLEX51 Conditional YO19
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4)
33.24 MW
Loading map...
Showing 6 locations