Reciprocating engines

341 unique locations (1612 components) - Page 1 of 14

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
135 CLYDESDALE PLACE, MOSS SIDE INDUSTRIAL ESTATE, LEYLAND, PR26 7QS (4 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• CMU consisting of multiple reciprocating engines and alternators
Active • 2024-25 (T-4), 2023-24 (T-4) ...
9.68 MW
160 Ipswich Road, Stoke Holy Cross, Norwich NR14 8PQ, UK (3 components)
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Reciprocating engines Yare Power Limited New Build Generating CMU Norwich Norwich NR14
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
93.16 MW
4 Chemistry Ln, Pentre, Deeside, CH5 2DA (9 components)
• Peak power plant
• Reciprocating engine
DSR Reciprocating engines KIWI POWER LTD Unproven DSR CMU CMU - Unproven KIWI75 CH5
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
42.84 MW
53 Valley Road, Plymouth, PL7 1RF (6 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
19.04 MW
7 Tartraven Place, Broxburn, West Lothian EH52 5LT (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Reciprocating engines Point Energy EM Limited New Build Generating CMU FULSCOT1 EH52
Inactive • 2023-24 (T-4), 2022-23 (T-3)
7.18 MW
9A Parker Avenue, Felixstowe, IP11 4AD (3 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
9.49 MW
A65, Kirby Lonsdale, Carnforth, LA6 2HH (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Kirkby Lonsdale 2 Not Prequalified LA6
Inactive • 2023-24 (T-4), 2022-23 (T-3)
7.18 MW
Aaron Road Industrial Estate, Peterborough, Cambridgeshire, PE7 2EX (5 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
21.43 MW
Abercorn Street, Paisley, PA3 4DF (5 components)

A new build, gas fuelled generation station.

Reciprocating engines ABERCORN GENERATION LIMITED New Build Generating CMU Abercorn Road Abercorn Road +2 more PA3
Active • 2024-25 (T-4), 2023-24 (T-4) ...
76.10 MW
Aldon Road, Poulton-le-Fylde, Lancashire FY6 8JL (5 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines ALDON POWER LIMITED New Build Generating CMU Aldon Aldon +2 more FY6
Active • 2024-25 (T-4), 2023-24 (T-4) ...
57.08 MW
Anchor Lane, Abbess Roding, Ongar, CM5 0JR (8 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
22.82 MW
Applied Automation, Eastern Wood Road, Langage Industrial Estate, PL7 5ET (6 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
16.18 MW
Ashton Old Road, Openshaw, Manchester M11 1AA (5 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines ASHTON POWER LIMITED New Build Generating CMU Ashton Ashton +2 more M11
Active • 2024-25 (T-4), 2023-24 (T-4) ...
68.49 MW
Askern CMM Generation, Campsall Road, Askern, Doncaster DN6 0FD (8 components)
• Gas fired generating unit(s)
• Gas fired reciprocating engines
• Gas-fired reciprocating engines
Reciprocating engines REGENT PARK ENERGY LIMITED Existing Generating CMU A11708 Askern +1 more DN6
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
7.48 MW
Aspatria Business Park, Park Road, Aspatria, CA7 3DP (4 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Reciprocating engines SWB Power Ltd New Build Generating CMU ASPATRIA BP ASPATRIA BP +1 more Conditional CA7
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
7.13 MW
Automated Processing Centre, Middle Bank, Doncaster DN4 5NE (3 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines STOR 102 Ltd New Build Generating CMU Hyde Hyde Conditional DN4
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
41.83 MW
Balle Street, Darwen, Blackburn BB3 2AZ (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines STOR 130 LTD New Build Generating CMU Balle Balle +1 more Conditional BB3
Active • 2024-25 (T-4), 2023-24 (T-4) ...
57.07 MW
Bankside Industrial Estate, Middlefield, Glensburgh, Falkirk FK2 7XU (2 components)

The facility consists of a 19.9MW gas facility.

Reciprocating engines SPECTRUMRESERVE4 LTD New Build Generating CMU Bankside Industrial Estate FK2
Inactive • 2023-24 (T-4), 2022-23 (T-3)
18.90 MW
Belvedere Lane, Bletchley, Milton Keynes, MK17 9JH (2 components)

3 x 2MW gas fuelled generators on a compound on land to west of A5.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
5.70 MW
Bevercotes 1 Energy Park, West Drayton Avenue, Bevercotes, Nottinghamshire, DN22 8DB (9 components)
• 1x 1.35MW Containerised Generating sets.
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
26.15 MW
Bidston Landfill Site, Bidston Industrial Estate, Wirral, Merseyside, CH44 2HE (3 components)
• Gas fired reciprocating engine(s)
• The site comprises of gas reciprocating unit(s)
Reciprocating engines INFINIS ALTERNATIVE ENERGIES LIMITED New Build Generating CMU BIDSTON Conditional CH44
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
3.80 MW
Bilsthorpe Colliery Site, Bilsthorpe, Newark, Notts, NG22 8ST (5 components)
• Gas fired reciprocating engines
• Gas reciprocating engines
• MWM TCG 2020 x 2 1 x CAT 3520
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
18.28 MW
Bison Place, Leyland, PR26 7QR (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU MOSS SIDE LEYLAND Not Prequalified PR26
Inactive • 2023-24 (T-4), 2022-23 (T-3)
7.60 MW
Blacknell Lane, Crewkerne, TA18 7HE (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
6.84 MW
Bones lane, Cheddleton, Leek, Staffordshire, ST13 7BT (6 components)

1.9 MW Gas gen ENER-G 1999

Active • 2025-26 (T-4), 2024-25 (T-4) ...
5.81 MW
Loading map...
Showing 25 locations