Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

6 unique locations (18 components)

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Sutton Landfill Site, Huthwaite Road, Sutton-In-Ashfield, Mansfield, NG17 2HB (3 components) Geocoding Needed

Gas fired reciprocating engine(s)

Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
3.71 MW
Sutton Courtenay Landfill Site, Appleford Sidings, Sutton Courtenay, Abingdon, Oxfordshire, OX14 4PW (4 components) Geocoding Needed
β€’ Gas fired reciprocating engine(s)
β€’ Solar PV generation site
β€’ The site comprises of gas reciprocating unit(s)
Solar Photovoltaic Reciprocating engines ALKANE ENERGY UK LIMITED New Build Generating CMU SUTTONCOURTENAY Sutton Courtenay Solar Conditional OX14
Active β€’ 2025-26 (T-4), 2023-24 (T-4) ...
6.08 MW
Kirkless Landfill Site, Hemfield Close, Kirkless, Higher Ince, Wigan, WN2 2DW (3 components) Geocoding Needed

Gas fired reciprocating engine(s)

Reciprocating engines INFINIS ALTERNATIVE ENERGIES LIMITED New Build Generating CMU KIRKLESS KIRKLESS Not Prequalified WN2
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
3.71 MW
Immingham Landfill Site, Queens Road, Immingham, Lincolnshire, DN40 1QR (3 components) Geocoding Needed
β€’ Gas fired reciprocating engine(s)
β€’ The site comprises of gas reciprocating unit(s)
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
3.80 MW
Danes Moss Landfill Site, Gawsworth, Macclesfield, Cheshire, SK11 0LR (2 components) Geocoding Needed

Gas fired reciprocating engine(s)

Reciprocating engines INFINIS ALTERNATIVE ENERGIES LIMITED New Build Generating CMU DANESMOSS Not Prequalified SK11
Inactive β€’ 2023-24 (T-4), 2022-23 (T-3)
3.61 MW
Bidston Landfill Site, Bidston Industrial Estate, Wirral, Merseyside, CH44 2HE (3 components) Geocoding Needed
β€’ Gas fired reciprocating engine(s)
β€’ The site comprises of gas reciprocating unit(s)
Reciprocating engines INFINIS ALTERNATIVE ENERGIES LIMITED New Build Generating CMU BIDSTON Conditional CH44
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
3.80 MW
Loading map...
Showing 6 locations