Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

6 unique locations (21 components)

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Tarmac, Whitefield Road, Bredbury, SK6 2QP (2 components) Geocoding Needed

7MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.

Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU Bredbury Not Prequalified SK6
Inactive β€’ 2023-24 (T-4), 2022-23 (T-3)
6.65 MW
Llay Grid Capacity Site, Llay Hall Farm, Llay, Wrexham, LL12 0TH (4 components) Geocoding Needed
β€’ 3.4MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.
β€’ 3MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.
Active β€’ 2025-26 (T-4), 2024-25 (T-1) ...
9.30 MW
Land off Linketty Lane, Marshall Road, Plymouth PL7 4NR (2 components) Geocoding Needed

Gas fuelled Generating Sets

Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU WG20 PL7
Inactive β€’ 2023-24 (T-4), 2022-23 (T-3)
5.70 MW
Land off A40 (London Road), Wheatley, OX33 1YL (6 components) Geocoding Needed

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU PINXTON SOUGH ROAD +1 more OX33
Inactive β€’ 2023-24 (T-4), 2022-23 (T-3)
20.35 MW
Land at Langley's Lane, Old Mills, Radstock, BS39 7SS (4 components) Geocoding Needed
β€’ A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
β€’ A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Reciprocating engines SWB Power Ltd New Build Generating CMU LANGLEY'S LANE LANGLEY'S LANE +1 more BS39
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
17.14 MW
Elevator Road, Trafford Park M17 1BR (3 components) Geocoding Needed
β€’ 20MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound on Elavator Road
β€’ 20MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound on Elevator Road
Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU Elavator Elavator M17
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
38.02 MW
Loading map...
Showing 6 locations