33 unique locations (109 components) - Page 1 of 2

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Unit J1 Aven Industrial Park, Tickhill Road, Maltby, Rotherham, S66 7QR (3 components)

Gas fired generating sets (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Snape Lane, Doncaster, DN11 8RU (2 components)
• A 7MW gas fuelled generating station.
• A 7MW new build gas fuelled generating station.
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Rounponds Energy Limited, Roundponds Farm, Melksham, Wiltshire SN12 8DF (4 components)
• New build diesel or gas dual fuel generating station
• New build reciprocating generating station
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Rounponds Energy Limited Roundponds Farm, Melksham, Wiltshire SN12 8DF (4 components)
Reciprocating engines OCGT and Reciprocating Engines HC ESS3 LIMITED New Build Generating CMU Rounponds1 Rounponds1 SN12
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Private Road No.5, Colwick, Nottingham, NG4 2JU, *Post code and grid reference may not match because site address is not yet registered with post office. We have used nearest available post code. (3 components)
• New reciprocating genset in acoustic enclosure
• New reciprocating engine in acoustic enclosure.
Inactive • 2022-23 (T-4), 2018-19 (T-1)
Plymouth Energy Park (Former Toshiba Site), Ernsettle Lane, Plymouth. PL5 2EY, Note: OS ref SX446601, postcode PL5 2EY, and postcode PL5 2TT and PL5 2TS all relate to the same site. Postcode is ambiguous as site has not been allocated a postcode by the post office at the current time). (5 components)
• The site consists of 48 diesel generators.
• This is an additional CMU component in addition to the existing 20MW diesel plant on the site. This CMU has been created on the basis of a recent bid to convert part of this plant to provide EFR. If that bid is successful then this CMU will be used to apply to provide CM services from the upgraded site. If the EFR bid is unsuccessful this CMU application may be withdrawn and the existing CMU used. The CMU will be based in a diesel/battery hybrid configuration providing 10MW of generation. The plant will be produced through an upgrade of the existing diesel site.
Reciprocating engines Keystone Power Limited Keystone EFR Plymouth +1 more PL5
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Old Mill Industrial Estate, Mansfield, NG19 9BG (3 components)
• 1 x MWM TCG 2016V
• Gas fired generating unit
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Lubenham Road, Market Harborough, Leicestershire, LE16 9NP, *Post code and grid reference may not match because site address is not yet registered with post office. We have used nearest available post code. (4 components)
• New reciprocating genset in acoustic enclosure
• New containerised battery storage equipment
• New reciprocating genset in acoustic enclosure
Inactive • 2022-23 (T-4), 2018-19 (T-1)
Land to the east of Marl Road, Knowsley, Kirkby, L33 7UH (4 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Land to the east of Marl Road, Knowsley, Kirkby, L33 7UH (4 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
"Land to the east of Marl Road, Knowsley, Kirkby, L33 7UH (3 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (3)

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Land at Seal Sands Road, Seal Sands, Middlesbrough, TS2 1UB (6 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land at Ernest Nunn Road, Stowmarket, IP14 2AH (3 components)

CMU is a new 20MW facility, metered on the edge of the distrbution boundary using a COP2 meter and with no auxilliary load on site.

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land at Ernest Nunn Road, Stowmarket IP14 2AH (3 components)
• CMU is a new 20MW facility, metered on the distrbution boundary using a COP2 meter with no auxilliary load on site.
• CMU is a new 20MW facility, metered on the edge of the distrbution boundary using a COP2 meter and with no auxilliary load on site.
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land at Burn Park Farm, Cottingham, HU16 5SB (4 components)
• Battery storage plant
• Gas Peaking Reciprocating engines
• Gas peaking reciprocating engine
Reciprocating engines OCGT and Reciprocating Engines NORTON STORAGE LIMITED New Build Generating CMU Creyke Beck Power 002 Creyke Beck Power 025 +2 more HU16
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Hills Storage & Distribution Centre, Stanley Way, Stanley Industrial Estate, Skelmersdale, WN8 8EA (3 components)
• 20MW gas fuelled generating station
• A new build gas fuelled generating station.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Haverton Hill Road, Stockton-on-Tees, Billingham TS23 1PS (4 components)
• Gas and/or diesel reciprocating engines.
• New build power station comprised of multiple reciprocating engines.
• Power station comprised of multiple reciprocating engines.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Loading map...
Showing 25 locations