Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

1159 unique locations (5745 components) - Page 46 of 47

Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (18 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.89 MW
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (16 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
59.11 MW
Waun y Pound Industrial Estate, Ebbw Vale, South Wales, NP23 6PL (25 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution and gas networks.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Weighbridge Rd, Deeside CH5 2LL, UK (2 components)

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Inactive • 2022-23 (T-4)
Welkin Road, Bredbury, SK6 2BH (7 components)
• A gas fuelled generating station.
• Battery Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-1) ...
21.50 MW
Wellington Street, Oldham, Lancashire OL4 1SA (8 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment.
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
18.20 MW
Westerham Road Sundridge Kent TN14 6ED (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
West Road North, Cross Green, Leeds, West Yorkshire, LS10 1RR (2 components)
• Gas engines in a peaking plant environment
• New gas engines in a peaking plant environment, servicing power generation and DSR.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Westwood Way, Wigan, WN3 4HH (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4)
Whaley Road, Barnsley, S75 1HT (1 component)

The CMU Component will be made up of gas fired engines.

Inactive • 2022-23 (T-4)
Whaley Road, Whaley Rd, Barnsley S75 1HQ (6 components)

Generating unit

Active • 2025-26 (T-4)
Wheldale 2 Wheldale Road Castleford West Yorkshire WF10 2RT (1 component)

Gas reciprocating engines

Inactive • 2019-20 (T-1)
Wheldale 2 Wheldale Road Castleford West Yorkshire WF10 2RT (3 components)

Gas reciprocating engines

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Wheldale Generation Site Wheldon Road Castleford West Yorkshire WF10 2RT (7 components)

Gas reciprocating engines.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.72 MW
Whessoe Road, Whessoe, Harrowgate Village, Darlington, DL3 0XD (1 component)

A new build, gas fuelled generation station.

Active • 2024-25 (T-4)
Whittington Rd, Barrow Hill, Chesterfield S43 2PW (4 components)

New reciprocating genset in acoustic enclosure

Inactive • 2020-21 (T-4), 2019-20 (T-1)
Whitwell Energy Park Southfield Lane Whitwell Derbyshire S80 3LH (4 components)

Gas reciprocating engines.

Active • 2028-29 (T-4), 2026-27 (T-4) ...
4.10 MW
Whitwell Energy Park, Southfield Lane, Whitwell, Derbyshire, S80 3LH (8 components)
• 1 x 2MW gas gen sets at Whitwell Energy Park.
• Gas reciprocating engines as the generating unit.
Active • 2027-28 (T-4), 2020-21 (T-4) ...
Whitwell Energy Park, Southfield Lane, Whitwell, Derbys S80 3LH (6 components)
• Gas reciprocating engines
• Reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Willand reserve Power EX15 2PJ (3 components)

16MW gas fired engines provide back up power to the local grid

Inactive • 2019-20 (T-1)
Willow Farm Doncaster Road Tadcaster LS24 9PA (1 component)

New build power station comprised of multiple reciprocating engines.

Inactive • 2019-20 (T-1)
Willow Farm Doncaster Road Tadcaster LS24 9PA (3 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Loading map...
Showing 25 locations