"Land to the east of Marl Road, Knowsley, Kirkby, L33 7UH (2 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
18.96 MW
Factory Lane Croydon Surrey CR0 3LE (1 component)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output

Inactive • 2022-23 (T-4)
Eyre Street, Birmingham, B18 7AD (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Exeter Road, Ottery St. Mary, EX11 1RB (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Excalibur Road, Beacons Park, Gorleston, Great Yarmouth, Norfolk NR31 7RQ (17 components)

New build power station comprised of multiple reciprocating engines.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Europa Energy Centre, Hills Court Road, Ash, Kent, CT3 2AP (26 components)
• The CMU BREH14 consists of two CHP components supplying heat, CO2 and power to the on site Nursery.
• The CMU BREH14 consists of two CHP components supplying heat, CO2 and power to the on-site Nursery.
• The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
55.68 MW
E.r.f Way, Middlewich CW10 0QJ (8 components)

Gas fired reciprocating engines

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
ENTERPRISE POWER 11 - 12 ENTERPRISE WAY WESTWOOD INDUSTRIAL ESTATE MARGATE CT9 4JA (6 components)

CMU consisting of multiple gas reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-1) ...
4.76 MW
ENTERPRISE POWER 11 - 12 ENTERPRISE WAY WESTWOOD INDUSTRIAL ESTATE MARGATE CT9 4JA (3 components)

CMU consisting of multiple gas reciprocating engines and alternators

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
4.76 MW
Enterprise Drive, Four Ashes, Wolverhampton WV10 7DF (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Ely Road Waterbeach Cambridge Cambridgeshire CB25 9PG (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Elm Court Estate, Capstone Road, Gillingham, ME7 3JQ (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4)
Ellifoot Lane, Burstwick, HU12 9EB (7 components)
• A Distribution Connected 4.5MW gas fueled generating station
• a Combined Heat and Power Plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
29.03 MW
Elevator Road, Trafford Park M17 1BR (3 components)
• 20MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound on Elavator Road
• 20MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound on Elevator Road
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Eldon Way, Biggleswade, SG18 8NH (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4)
Edge Lane Street Royton Oldham OL2 6DS (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
EDF Land, Cliff Quay, Ipswich Docks, Suffolk, IP3 0NA (Please refer to "Equivalence Energy Limited - PPG Supporting Letter" for further clarity on the CMU address) (2 components)

Renewable green diesel fuelled generators, connected to the distrbution network at 132KV, metered using a standard half-hour (COP2) meter at the distrbution network boundary with no auxilliary load on site.

Inactive • 2019-20 (T-1)
EDF Land, Cliff Quay, Ipswich Docks, Suffolk, IP3 0NA (Please refer to "Equivalence Energy Limited - PPG Supporting Letter" for further clarity on the CMU address) (1 component)

Renewable green diesel fuelled generators, connected to the distrbution network at 132KV, metered using a standard half-hour (COP2) meter at the distrbution network boundary with no auxilliary load on site.

Inactive • 2019-20 (T-1)
EDF Land, Cliff Quay, Ipswich Docks, Suffolk, IP3 0NA (Please refer to "Balance Power Limited - PPG Supporting Letter" for further clarity) (2 components)

A 20 MW CMU, operating on a dockside, metered at the distribution boundary and having no auxilliary load on site.

Inactive • 2019-20 (T-1)
EDF Land, Cliff Quay, Ipswich Docks, Suffolk, IP3 0NA (Please refer to "Balance Power Limited - PPG Supporting Letter" for further clarity) (1 component)

A 20 MW CMU, operating on a dockside, metered at the distribution boundary and having no auxilliary load on site.

Inactive • 2019-20 (T-1)
Eagle Business Park, Yaxley, PE7 3GP (12 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-1) ...
20.56 MW
Dunsteads Farm, Trueloves Lane, Ingatestone, CM4 0NH (1 component)

20MW gas fuelled plant using new containerised engines with associated switchgear, substation and gas metering kiosk, and connections to the electricity and gas grid. The total planned capital expenditure for …

Inactive • 2022-23 (T-4)
Dunnikier Peaking Power, Wheatfield Road, Kirkcaldy. Fife. KY1 3PE (2 components)

The CMU is a new reciprocating engine based gas fuelled generating unit.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Drakelow Power Station, Burton-on-Trent, DE15 9NG (2 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4)
Drake Grove, Burndell Road, Yapton, Arundel, BN18 0HX (6 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2026-27 (T-4), 2025-26 (T-1) ...
27.29 MW