Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

2 unique locations (9 components)

Active MW: 14652.51 MW
Inactive MW: 930.44 MW
Batleys Cash and Carry Talbot Road Fareham PO15 5RY (5 components)
• The CMU component is net of the auxiliary power required (2)
• A completed power plant, with associated civil works, switchgear and electrical connection.
Reciprocating engines W4B RENEWABLE ENERGY LIMITED PEAK GEN TOP CO LIMITED Existing Generating CMU W4B 2020 16MW W4B 2020 16MW +2 more PO15
Active • 2028-29 (T-4), 2027-28 (T-4) ...
52.31 MW
Batleys Cash and Carry Talbot Road Fareham PO15 5RY (4 components)

The CMU component is net of the auxiliary power required (3)

Reciprocating engines W4B RENEWABLE ENERGY LIMITED Existing Generating CMU W4B 2020 16MW W4B 2020 16MW +2 more PO15
Active • 2024-25 (T-1), 2023-24 (T-1) ...
33.85 MW
Loading map...
Showing 2 locations