Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (90 components)
• E1000 CHP
• Existing CCGT
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
2435.45 MW
ACS&T - Wolverhampton - Site 2, ACS&T Logistics, Park Lane , Wolverhampton, WV10 9QD (30 components)
• Gas fired reciprocating engines.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
43.30 MW
Asda Boston, Unit 2 Welland Business Park, Clay Lake, Spalding PE12 6BL (5 components)
• A gas fuelled generating station.
• Grain B CCGT Unit 7 CHP element is via supply of heat to Grain LNG regasification facility
• Load reduction on site supported by non-exporting standby generation.
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (46 components)
• Hamms Hall - Existing Site CHP
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
179.28 MW
Challenge Way, Blackburn, Lancashire BB1 5QB (2 components)
• Connah's Quay PS Unit 4 CCGT
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2025-26 (T-4), 2022-23 (T-3)
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (35 components)
• A 7.5MW Tesla Battery Energy Storage System
• Killingholme Module 1 converted to open cycle operation
• Killingholme Module 2 converted to open cycle operation
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2098.53 MW
Chickerell Generation Site, Off Radipole Lane, Chickerell, Weymouth, DT3 4PA (17 components)
• 1 x OCGT
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Gas fuelled generation plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
265.86 MW
Chippenham Station, Cocklebury Lane, Chippenham, SN15 1RS (11 components)
• 4 x reciprocating engines
• A 20MW New Build Battery Storage site
• CHP Unit
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Component has yet to be procurred (226 components)
• Component has yet to be procurred
• District heating implementation with one asset 1MW and no auxiliary load
• Poole Existing Site CHP
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1238.88 MW
Cwm Rheidol Aberystywth, Ceredigion SY23 3NF Aberystwyth (34 components)
• An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass burn technology which is the most proven Energy from Waste technology currently available. The process will consist of the delivery of waste to the Facility by truck where it will be deposited in a storage bunker, from which it will be fed into two thermal units. Each unit will consist of a moving grate, boiler and air pollution control equipment. The steam generated will drive a turbine for the generation of electricity.
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Cwm Rheidol Power Station (being one out of two) which is supplied by water from the Dinas Reservoir.
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Dinas Power Station, which is supplied by water from the Nant-y-Moch reservoir.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
151.50 MW
Dafen Power, Llethri Road, Dafen Park Industrial Estate, Llanelli, SA14 8QN (9 components)
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and an expected export of 36MW. Located in the Chittering Industrial Estate in Avonmouth.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
9.31 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1613.68 MW
DS Smith Paper Limited, Kemsley Paper Mill, Sittingbourne, Kent, ME10 2TD (30 components)
• A 49MW New Build Battery Storage Site.
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
• A steam turbine generating unit, part of a CHP which supplies heat & power to a paper mill
Inactive • 2023-24 (T-1), 2022-23 (T-4) ...
214.92 MW
EDF Energy, Hartlepool power station, Tees Road, Hartlepool, TS25 2BZ (57 components)
• Hartlepool Power Station CMU 2: [HR2-23] T_HRTL-2
• Hartlepool Power Station CMU 2: [HR2-24] T_HRTL-2
• Hartlepool Power Station CMU 1: [HR1-24] T_HRTL-1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5859.76 MW
EDF Energy, Sizewell B power station, Nr Leiston, Suffolk, IP16 4UR (39 components)
• Sizewell B Power Station CMU 1: [SZ1-24] T_SIZB-1 + (50% x T_SIZB-D)
• Sizewell B Power Station CMU 2: [SZ2-23] T_SIZB-2 + (50% x T_SIZB-D)
• Sizewell B Power Station CMU 2: [SZ2-24] T_SIZB-2 + (50% x T_SIZB-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4640.16 MW
EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU (34 components)
• Torness Power Station CMU 1: [TN1-23] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 1: [TN1-24] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 2: [TN2-24] T_TORN-2 + (50% x T_TORN-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3068.68 MW
Gunnels Wood Road, Stevenage, SG1 2NY, United Kingdom (25 components)
• CMU consisting of multiple reciprocating engines and alternators
• New build power station comprised of multiple reciprocating engines.
• On-site existing CHP generating unit
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Heathfield Landfill, John Acres Lane, Kingsteignton, Devon, TQ12 3GP (3 components)
• DSR Component providing load turn down at a data centre
• OCGT from Grain U4. Fuel is Gas Oil as specified in BS 2869 Class A2
• The CMU at the Heathfield Landfill site in Devon will be made up of three reciprocating engines generating from natural gas. In their current state, these engines have been designed to generate from landfill gas, but will be converted to natural gas and then recommissioned, ahead of the delivery year. The three components of the CMU (referenced VIR074, VIR079 and VIR080) are Cummins QSV91 units, built in 2008 and rated at 1,750kW. Each engine generates at 415V, which is then stepped up to 11kV and then to 33kV for export.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land at Oaklands Farm Featherstone Lane, Wolverhampton, Staffordshire, WV10 7JZ (4 components)
• Enfield CCGT Power Station - (one unit station)
• New Build CMU comprising of battery storage and associated plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2025-26 (T-4) ...
29.43 MW
Land off Amy Johnson Way, Blackpool, FY4 2RS (14 components)
• A gas fuelled generating station.
• Connah's Quay PS Unit 1 CCGT
• Containerized high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear
Active • 2028-29 (T-4), 2023-24 (T-4) ...
6.54 MW
LAND ON BREDBURY WAY STOCKPORT SK6 2TF (6 components)
• CMU consisting of multiple gas reciprocating engines and alternators
• Connah's Quay PS Unit 3 CCGT
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
4.76 MW
Land on the east side of Cowpen Bewley Road, Billingham,  TS23 4ED (26 components)
• Gas peaking reciprocating engine
• On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
• Reciprocating genset
Active • 2028-29 (T-4), 2027-28 (T-4) ...
236.69 MW
LAND ON THE NORTH SIDE OF DESFORD ROAD, ENDERBY, LEICESTER, LE19 3LR (18 components)
• Battery Storage Plant
• Small gas fired OCGT.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
98.37 MW
Land to the east side of Brunel Road, Manor Trading Estate, Benfleet, Essex, SS7 4PS (14 components)
• 14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• District heating implementation of two gas CHP engines with no auxilliary load
• OCGT from Grain U1. Fuel is Gas Oil as specified in BS 2869 Class A2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land to the south of the A883, Falkirk Road, near Bonnybridge FK4 1SN. This site pre-qualified last year as CFBS13 (4 components)
• Grain B CCGT Unit 7 CHP element is via supply of heat to Grain LNG regasification facility
• Load reduction on site supported by non-exporting standby generation.
• The facility consists of a series of gas fired generators. It connects to SPEN?s 33kV distribution network at 33kV.
Inactive • 2022-23 (T-4), 2022-23 (T-3)