Reciprocating engines

42 unique locations (874 components) - Page 1 of 2

Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (67 components)
β€’ A gas engine CHP site providing electricity & heat to the associated development
β€’ A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
β€’ Load reduction on site supported by non-exporting standby generation.
Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (19 components)
β€’ A gas engine CHP site providing hot water to a local district heating network
β€’ Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
β€’ One CHP engine in a horticultural environment with no auxilliary load.
Active β€’ 2027-28 (T-4), 2025-26 (T-4) ...
8.14 MW
Trumfleet Generation Site, Marsh Lane, Trumfleet, Doncaster. DN6 0DU (23 components)
β€’ A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
β€’ The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
Traston Road, Off Corporation Road, Newport , Gwent, NP19 4RQ (27 components)
β€’ Generating Unit 1
β€’ ROCable hydro units within the BMU are not included in the CMU.
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
49.17 MW
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (4 components)
β€’ 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
β€’ One of six CHP units at University of Warwick, Coventry, CV4 7AL
β€’ Onsite load reduction and back up generation behind the meter on multiple sites
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP (18 components)
β€’ Aggregate CMU from multiple sources
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
β€’ The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Active β€’ 2026-27 (T-4), 2022-23 (T-4) ...
9.52 MW
The Canalside, Marsh Lane, off Showground Road, Bridgwater, Somerset, TA6 6LQ (20 components)
β€’ Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
β€’ New build windfarm.
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active β€’ 2028-29 (T-4), 2026-27 (T-4) ...
41.74 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (34 components)
β€’ District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
β€’ The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
β€’ The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
25.22 MW
Stockport Metropolitan Borough Council, Stopford House, Edward Street, Stockport, SK1 3UR (10 components)
β€’ Gas CHP engines in commercial horticultural environment with no auxilliary load
β€’ Stockport DSR
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
29.10 MW
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (23 components)
β€’ 49.900MW/49.900MWh battery storage asset, 1 hour duration
β€’ Gas fired CHP unit
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
18.70 MW
Saltend Power Station Saltend Hull HU12 8GA (30 components)
β€’ Unit 1 at Saltend Power Station
β€’ Unit 2 at Saltend Power Station
β€’ Unit 3 at Saltend Power Station
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
3486.78 MW
Poole Bank Nurseries , Common Lane, Welton, Hull, HU15 1UT (18 components)
β€’ Aggregate CMU from multiple sources
β€’ BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active β€’ 2027-28 (T-4), 2024-25 (T-4) ...
287.90 MW
MytheΒ Road. Tewkesbury. Gloucester. GL20 6AA (18 components)
β€’ Load reduction on site supported by non-exporting standby generation.
β€’ The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
β€’ West Burton A Power Station Combined CMU WAC-21 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-3 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
7.15 MW
Monkton Road, Wakefield, Yorkshire, WF2 7AL (13 components)
β€’ The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
β€’ The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active β€’ 2024-25 (T-4), 2022-23 (T-4) ...
Marsh Road, Far Banks, North Meols, Banks, West Lancashire, Lancashire, PR9 8DX (8 components)
β€’ A gas fuelled CHP plant
β€’ A gas fuelled Combined Heat and Power plant
β€’ Gas reciprocating engines
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
8.51 MW
Maltby 1 Colliery Ltd Tickhill Road Rotherham South Yorkshire S66 7QW (4 components)
β€’ 8x 1.40MW Containerised Generating sets.
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive β€’ 2022-23 (T-3), 2016-17 (TR)
3.05 MW
London School of Hygiene & Tropical Medicine Keppel St, Bloomsbury, London WC1E 7HT (6 components)
β€’ 20 x 1mw gas generator units to be installed on designated land at Kitching Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
β€’ Killingholme Module 2 converted to open cycle operation please see letter uploaded to metering section that explains determination of three highest HH
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE (35 components)
β€’ 4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs
β€’ Energy facility comprising of reciprocating engine sets and ancillary equipment.
β€’ Existing Generation CMU - Onshore Wind. Connected at WesterDod 132kV substation.
Active β€’ 2027-28 (T-4), 2025-26 (T-4) ...
128.11 MW
LAND ON THE NORTH SIDE OF GALLEY HILL ROAD NORTHFLEET GRAVESEND DA11 9SW (9 components)
β€’ CMU consisting of multiple reciprocating engines and alternators
β€’ Existing OCGT
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive β€’ 2023-24 (T-4), 2023-24 (T-1) ...
9.63 MW
Land on south side of Beryl Street, Baldovie Industrial Estate, Dundee, DD4 0HX (2 components)
β€’ A new build, gas fuelled generation station.
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive β€’ 2022-23 (T-4)
LAND AT 54 BUCKLAND ROAD, PEN MILL TRADING ESTATE, YEOVIL, BA21 5HA (2 components)
β€’ 10 gas reciprocating engines used for power generation, with associated infrastructure.
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive β€’ 2022-23 (T-3), 2021-22 (T-4)
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (16 components)
β€’ Gas fired reciprocating engines.
β€’ Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
β€’ The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Active β€’ 2024-25 (T-4), 2022-23 (T-4) ...
Land adjacent to Netherlands Way / Europa Way Stallingborough Grimsby DN41 8DT (6 components)
β€’ 10 x 2MW gas reciprocating engines
β€’ 10x 2MW Gas Reciprocating Engines
β€’ Gas reciprocating engines
Active β€’ 2024-25 (T-1), 2023-24 (T-4) ...
38.91 MW
Houghton Main CMU Generation Plant, Park Spring Road, S Grimethorpe, S72 0HN (8 components)
β€’ Gas reciprocating engines
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive β€’ 2023-24 (T-4), 2022-23 (T-3) ...
5.04 MW
Hams Hall Sustainable Energy LTD, Edison Road, Hams Hall Distribution Park, Coleshill, B46 1AL (18 components)
β€’ Battery Storage Plant
β€’ Hamms Hall - Existing Site CHP
β€’ Poole Existing Site CHP
Active β€’ 2028-29 (T-4), 2026-27 (T-4) ...
18.43 MW