Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

10 unique locations (111 components)

Units 13 and 14, Ashmount Business Park, Upper Forest Way, Swansea Enterprise Park, Swansea, SA6 8QR (1 component)

14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Inactive • 2022-23 (T-4)
13.13 MW
Toray 3, Toray Textiles Import Way Crown Farm Way Nottinghamshire NG19 0FN (5 components)
• Gas fired generating unit
• Gas generating unit(s)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
3.54 MW
Toray 2, Toray Textiles, Import Way Crown Farm Way Mansfield NG19 0FN (3 components)

Gas generating unit(s)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.38 MW
Manvers Callflex Business Park South of Doncaster Road Rotherham S63 7EF (8 components)
• Gas generating unit(s)
• Gas reciprocating engines
Active • 2028-29 (T-4), 2026-27 (T-4) ...
12.79 MW
Lymedale Business Park, Holditch Road, Newcastle-under-Lyme, ST5 9JA (8 components)
• The CMU Component is made of brand new gas-fired engines
• The CMU Component is made of brand new gas-fired engines.
• The CMU Component is made up of gas-fired engines
• ... and 1 more unique description
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land Off Gelderd Road, Beeston, Leeds. LS12 6DX. (3 components)

A 20MW New Build gas fuelled generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
38.02 MW
LAND EAST OF PILSWORTH ROAD ROCHDALE HEYWOOD OL10 2TA (6 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
3.80 MW
Harts Farm Way, Havant, PO9 1HS (5 components)
• Gas fired reciprocating engines
• Gas fired reciprocating engines.
• gas fired reciprocating engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
54.30 MW
Grimsby Power Station Moody Lane Grimsby DN31 2SW (12 components)
• CMU will be formed of multiple individual gas reciprocating engine units
• Ten (10) 2MWe gas reciprocating gas engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
142.54 MW
100 Montifichet Road, Westfield, Stratford E20 1GR (60 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
843.06 MW
Loading map...
Showing 10 locations