Reciprocating engines

172 unique locations (12562 components) - Page 1 of 7

YO25 (68 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
166.36 MW
WV16 (38 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
54.38 MW
WS4 (32 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
44.50 MW
WR6 (52 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-1) ...
54.59 MW
WR3 (73 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
61.59 MW
WR1 (16 components)

Domestic demand turn down

Active • 2024-25 (T-1)
0.04 MW
WF9 (44 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
98.52 MW
WD6 (83 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
131.90 MW
WA7 (107 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
141.12 MW
WA5 (220 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
168.85 MW
VIEW BILLESLEY LANE PORTWAY BIRMINGHAM WEST MIDLANDS B48 (3 components)
• "Wienerberger Ltd Whitlenge Lane, Hartlebury, Kidderminster, DY10 4JB The CMU Component reduces import demand by turning off equipment and other non-essential loads."
• Domestic EV charger
• Gas fired generating unit(s)
Active • 2025-26 (T-4), 2019-20 (T-1) ...
TW20 (31 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
40.15 MW
TS7 (58 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
48.00 MW
TS29 (14 components)

Domestic EV charger

Active • 2024-25 (T-4)
0.03 MW
TR11 (44 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
141.08 MW
TN4 (54 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
78.09 MW
Thurscoe Business Park, Barrowfield Rd, Thurscoe, Rotherham S63 0DB (3 components)

Gas reciprocating engines

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
TF2 (83 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
93.06 MW
TA9 (25 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
85.15 MW
TA11 (28 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
43.47 MW
SY3 (87 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
171.75 MW
SS4 (36 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-1) ...
136.67 MW
SS3 (21 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
30.68 MW
SS16 (46 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
55.38 MW
SS15 (39 components)

Domestic EV charger

Active • 2025-26 (T-1), 2025-26 (T-4)
Loading map...
Showing 25 locations