13 unique locations (233 components)

Recycling Centre Meek Street Rochdale OL2 6HL (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
Millfield Lane Haydock Industrial Estate Haydock St Helens WA11 9UT (13 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
25.80 MW
Millfield Lane Haydock Industrial Estate Haydock St Helens WA11 9UT (5 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2026-27 (T-4) ...
15.55 MW
Land on west side of Droppingwell Road, Sheffield, S61 2DW (4 components)

3 x 2MW gas generator units to be installed on a compound adjacent to Droppingwell Road

Inactive • 2023-24 (T-4), 2022-23 (T-3)
LAND LYING TO THE SOUTH OF WEST QUAY ROAD WINWICK WA2 8TL (5 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (40 components)
• The CMU component is a combined cycle gas turbine
• This CMU (CARRI3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
• This CMU (CGTN_3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2492.31 MW
Booker Cash and Carry Frobisher Way Hatfield Hertfordshire AL10 9TR (12 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.67 MW
Booker Cash and Carry Frobisher Way Hatfield Hertfordshire AL10 9TR (4 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2023-24 (T-1) ...
9.48 MW
Booker Cash and Carry Didcot OX11 7HJ (7 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.14 MW
Booker Cash and Carry Didcot OX11 7HJ (3 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
3.14 MW
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (11 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.63 MW
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (4 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2023-24 (T-1) ...
11.32 MW
AL1 (123 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW