Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

31 unique locations (425 components) - Page 1 of 2

1, THE OLD BARN PURLIEUS, MINETY, MALMESBURY SN16 9RP (Nearest postcode to grid reference: SN16 9DX). (19 components)
โ€ข Battery Storage Plant
โ€ข Load reduction on site supported by non-exporting standby generation.
โ€ข Reciprocating genset in acoustic enclosure
Active โ€ข 2025-26 (T-4), 2023-24 (T-4) ...
53.56 MW
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (16 components)
โ€ข 1.200MW BESS
โ€ข A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
โ€ข District heating implementation of two gas CHP engines with no auxilliary load
Active โ€ข 2026-27 (T-4), 2025-26 (T-4) ...
9.27 MW
4 Finway Road Hemel Hempstead HP2 7PT (11 components)
โ€ข 14.710 MW CHP generation
โ€ข Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
โ€ข Onsite load reduction and back up generation behind the meter on multiple sites
Active โ€ข 2024-25 (T-4), 2022-23 (T-3) ...
4.76 MW
ABP Ellesmere, The Abattoir, Hordley, Ellesmere SY12 9BL, United Kingdom (17 components)
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข ROCable hydro units within the BMU are not included in the CMU.
โ€ข Turbomach M50 Natural Gas fired CHP unit
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
77.42 MW
ACS&T - Wolverhampton - Site 2, ACS&T Logistics, Park Lane ,ย Wolverhampton, WV10 9QD (30 components)
โ€ข Gas fired reciprocating engines.
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 MW.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
43.30 MW
Ardagh Group - Barnsely Site 2, Burton Road, Monk Bretton South Yorkshire S71 5RP (18 components)
โ€ข 3.6MW of demand reduction
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข Load reduction on site supported by non-exporting standby generation.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
11.11 MW
Ashford Rd, Charing TN27 0DF, United Kingdom (10 components)
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข N/A
โ€ข New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active โ€ข 2024-25 (T-4), 2023-24 (T-4) ...
3.45 MW
Bevercotes Energy Park, West Drayton Avenue, Bevercotes, Nottinghamshire, DN22 8DB (5 components)
โ€ข 3 x 1MW / 1.2 MWh BYD Lithium Ion Battery
โ€ข a new build gas generating station
Inactive โ€ข 2023-24 (T-4), 2020-21 (T-4) ...
Bourne Park Solar Farm, Bourne Park, Piddlehinton, Dorset. DT2 7TU (4 components)
โ€ข 800kW/ 1100kWh BYD Lithium Ion Battery
โ€ข CMU consisting of multiple reciprocating engines and alternators
Inactive โ€ข 2023-24 (T-4), 2020-21 (T-4) ...
Caxton Way, Dinnington, Rotherham, S25 3QE (4 components)
โ€ข 1 MW diesel gensets
โ€ข A 10MW new build gas generating station..
Inactive โ€ข 2022-23 (T-1), 2020-21 (T-4)
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (10 components)
โ€ข 0.250MW Battery Energy Storage System
โ€ข 10 x 2MW gas generator units to be installed on designated land within Southbrook Farm
โ€ข 5MW of demand reduction
Active โ€ข 2024-25 (T-4), 2023-24 (T-4) ...
Eurac - Dorset, 16 Mannings Heath Road Poole Dorset BH12 4NJ (42 components)
โ€ข 10.000MW DSR
โ€ข A gas fuelled generating station.
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
21.66 MW
FEEDER PILLAR 1 (W9920), BROOKFIELD PARK, MANVERS WAY, WATH-UPON-DEARNE, ROTHERHAM, S63 5DJ (4 components)
โ€ข 2MW of demand reduction
โ€ข Gas reciprocating engines
Inactive โ€ข 2022-23 (T-4), 2019-20 (T-1)
Land At Mitchells Industrial Park, Bradberry Balk Lane, Wombwell, Barnsleym, S73 8HR (17 components)
โ€ข 5 MW of demand reduction
โ€ข CHP Unit
โ€ข New reciprocating gensets in acoustic enclosure
Inactive โ€ข 2023-24 (T-4), 2022-23 (T-4) ...
7.44 MW
land immediately adjacent to the existing Windyhill Electricity Grid Substation, North Of Baljaffray Road, Bearsden, East Dunbartonshire, G61 4PU. (12 components)
โ€ข 1 x hydro turbine & synchronous generator
โ€ข 3.600MW of demand reduction
โ€ข Lithium ion battery storage plant
Active โ€ข 2026-27 (T-4), 2025-26 (T-4) ...
41.27 MW
Land North of Clayhill Farm Westoning,MK45 5JD (5 components)
โ€ข 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Land North of Clayhill Farm Westoning,MK45 5JD
โ€ข A generating station consisting of multiple reciprocating engines and alternators located on a single site.
Inactive โ€ข 2022-23 (T-4), 2020-21 (T-4) ...
Land off Amy Johnson Way, Blackpool, FY4 2RS (14 components)
โ€ข A gas fuelled generating station.
โ€ข Connah's Quay PS Unit 1 CCGT
โ€ข Containerized high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear
Active โ€ข 2028-29 (T-4), 2023-24 (T-4) ...
6.54 MW
Marchwood Power, Marchwood Industrial Park, Oceanic Way, Marchwood, Southampton, SO40 4BD (22 components)
โ€ข 8.3MW Gas Turbine installation
โ€ข Existing CCGT unit
โ€ข Marchwood CCGT
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
3678.80 MW
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SU (20 components)
โ€ข 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
โ€ข 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
โ€ข Ratcliffe Unit 3 coal-fired unit
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
61.51 MW
Oaks, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (5 components)
โ€ข 1000kW/1200kWh Lithium Ion Battery
โ€ข Gas fired reciprocating engines
Inactive โ€ข 2022-23 (T-3), 2020-21 (T-4) ...
Pierces Farm, Field off Goring Lane, Grazeley Green, Reading, Berkshire. RG7 1LY (5 components)
โ€ข 1 x 250Kw/250KWh Lithium Ion Battery
โ€ข CMU consisting of a reciprocating engine and alternator
Inactive โ€ข 2023-24 (T-4), 2020-21 (T-4) ...
Plot A3, Watervole Way, Doncaster, DN4 5JP (5 components)
โ€ข 25 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets Disputes: 25*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions certification and using Gas-To-Liquids (GTL) fuels/lubricants and fitted with Exhaust Gas Treatments (EGT) incorporating Selective Catalytic Reduction (SCR), Diesel Particulate Filter (DPF) and Diesel Oxidation Catalyst (DOC) systems with ?ad-blue?)
โ€ข A 20MW new build gas generating station..
โ€ข A new build gas generating station.
Inactive โ€ข 2020-21 (T-4), 2019-20 (T-1)
Plot B at Severn Road Avonmouth BS10 7SE (11 components)
โ€ข Existing Generator Battery Energy Storage System
โ€ข Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
โ€ข New Build Battery Energy Storage Systems
Active โ€ข 2025-26 (T-4), 2025-26 (T-1) ...
5.25 MW
Poplars, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (10 components)
โ€ข 1 MW of demand reduction
โ€ข 1000kW/1200kWh Lithium Ion Battery
โ€ข Gas fired reciprocating engines
Inactive โ€ข 2022-23 (T-3), 2020-21 (T-4) ...
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (7 components)
โ€ข 0.5MW of demand reduction
โ€ข A generating station consisting on multiple reciprocating engines and alternators located on a single site
โ€ข Sizewell B Power Station CMU 2: [SZ2-19] T_SIZB-2 + (50% x T_SIZB-D)
Inactive โ€ข 2022-23 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 25 locations