Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

16 unique locations (169 components)

Sutton Courtenay Landfill Site, Appleford Sidings, Sutton Courtenay, Abingdon, Oxfordshire, OX14 4PW (4 components)
• Gas fired reciprocating engine(s)
• Solar PV generation site
• The site comprises of gas reciprocating unit(s)
Active • 2025-26 (T-4), 2023-24 (T-4) ...
3.37 MW
Land lying to the north west of Staithes Road, Hull, HU12 8DX (12 components)
• 21 MW power plant comprising 11 gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 21MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Gas fired CHP unit
Active • 2028-29 (T-4), 2025-26 (T-4) ...
41.44 MW
Land and Buildings Known as Teres House Copse Road And Land Lying to the North of East Denham Way Fleetwood FY7 7NY (16 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• Heysham 2 Power Station CMU 8: [HY2823] T_HEYM28 + (50% x T_HEYM2-D)
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme The registered capacity of the Kendoon power station is 26.25MVA or 24MW at 0.915PF. Each of the 2 generating unit components are identical, i.e. 12MW each for unit 1 and unit 2.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
Kirkless Landfill Site, Hemfield Close, Kirkless, Higher Ince, Wigan, WN2 2DW (5 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Gas fired reciprocating engine(s)
• Genset 2. ROCable hydro units within the BMU are not included in the CMU.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
21.04 MW
EPR Eye Power station, Oaksmere Business Park, Eye Airfield Industrial Estate, Yaxley, Eye, Suffolk, IP23 8BW (4 components)
• Gas fired reciprocating engine(s)
• Incineration of biomass to generate steam which drives a turbine.
Active • 2028-29 (T-4), 2023-24 (T-4)
35.92 MW
EDF Energy, Hinkley Point B power station, Nr Bridgwater, Somerset, TA5 1UD (56 components)
• Hinkley Point B Power Station CMU 7: [HP7-22] T_HINB-7 + (50% x T_HINB-D)
• Hinkley Point B Power Station CMU 7: [HP7-23] T_HINB-7 + (50% x T_HINB-D)
• Hinkley Point B Power Station CMU 8: [HP8-23] T_HINB-8 + (50% x T_HINB-D)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1771.09 MW
Dogsthorpe Landfill Site Welland Road Peterborough Cambridgeshire PE1 3TD (7 components)
• Gas reciprocating engines
• New build power station comprised of multiple reciprocating engines.
• New reciprocating gensets in acoustic enclosure
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11.44 MW
Danes Moss Landfill Site, Gawsworth, Macclesfield, Cheshire, SK11 0LR (3 components)
• Gas fired reciprocating engine(s)
• Generating unit 3.
Active • 2027-28 (T-4), 2022-23 (T-3)
20.98 MW
Aveley Landfill Site, Sandy Lane, Aveley, RM15 4XP (6 components)
• Gas reciprocating engines
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.62 MW
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (14 components)
• EV charging at residential premises
• Gas fired generating units
• Gas reciprocating engines
Active • 2027-28 (T-4), 2025-26 (T-4) ...
4.94 MW
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (8 components)
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
• Gas fired generating units
• Gas reciprocating engines
Active • 2027-28 (T-4), 2023-24 (T-1) ...
1.85 MW
Asda Witham Highfields Road, Benfield Way Lakes Road Braintree CM7 3YS (10 components)
• CHP unit
• Load reduction.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.71 MW
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6ZA (5 components)
• Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
Active • 2027-28 (T-4), 2020-21 (T-1) ...
1.08 MW
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (11 components)
• 10 gas reciprocating engines used for power generation, with associated infrastructure.
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Gas reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
6.65 MW
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (4 components)
• Gas reciprocating engines
• The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
Active • 2027-28 (T-4), 2023-24 (T-1) ...
2.13 MW
1 Ratty's Lane, Hoddesdon, Hertfordshire, EN11 0RF (4 components)
• Combined Cycle Gas Turbine
• Combined Cycle Gas Turbine plant
• Gas fired reciprocating engine(s)
Active • 2028-29 (T-4), 2026-27 (T-4) ...
978.65 MW
Loading map...
Showing 16 locations