Reciprocating engines

34 unique locations (734 components) - Page 1 of 2

2 Bar Lane, York, YO51 9LS (60 components)
• BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
• New build gas generator
Active • 2028-29 (T-4), 2027-28 (T-4) ...
45.41 MW
4 Chemistry Ln, Pentre, Deeside, CH5 2DA (16 components)
• BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage).
• Peak power plant
• Reciprocating engine
Inactive • 2022-23 (T-4), 2021-22 (T-1) ...
Adsworth Road, Stockport, SK3 8LF (3 components)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2027-28 (T-4), 2021-22 (T-1)
286.85 MW
Asda Scunthorpe, Scunthorpe Cold Store, Cupola Way, Scunthorpe DN15 9YJ (9 components)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on flexible electricity consuming processes
Active • 2025-26 (T-4), 2024-25 (T-4) ...
4.73 MW
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (9 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
22.63 MW
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (42 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• On-site existing CHP generating unit
Active • 2027-28 (T-4), 2024-25 (T-4) ...
Component has yet to be procured. (154 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Component has yet to be procured.
• N/A
Active • 2025-26 (T-4), 2024-25 (T-4) ...
252.48 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1613.68 MW
Excalibur Road, Beacons Park, Gorleston, Great Yarmouth, Norfolk NR31 7RQ (20 components)
• BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage)
• New build power station comprised of multiple reciprocating engines.
• Unit 4 Cruachan pump storage hydro plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
5.71 MW
Ffestiniog Power Station, Tanygrisiau, Blaenau Ffestiniog, LL41 3TP (48 components)
• 1hr duration battery storage project.
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
476.10 MW
Land at Exmoor Windows Brunel Way Minehead TA24 5BY (9 components)
• BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage)
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2024-25 (T-4), 2023-24 (T-1) ...
27.42 MW
Land at Fulwood Rd North, Sutton-in-Ashfield, NG17 2NB (30 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Battery storage unit
• New reciprocating gensets in acoustic enclosure
Active • 2025-26 (T-4), 2024-25 (T-4) ...
10.42 MW
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (19 components)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• CMU comprising of battery storage and associated plant
• New build power station comprised of multiple reciprocating engines.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
50.46 MW
Land at Model Farm, Frenchs Road, Walpole St. Andrew, Norfolk, PE14 7JE. (17 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 2026 kW CHP unit
• N/A
Active • 2025-26 (T-4), 2022-23 (T-4) ...
Land at Silverwood colliery site, Hollings lane, Ravenfield, Rotherham, S65 4LQ. (4 components)
• A 20MW New Build gas fuelled generating station.
• A New Build gas fuelled generating station.
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
Active • 2026-27 (T-4), 2022-23 (T-4) ...
269.81 MW
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (3 components)
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
2.36 MW
Land at Woolaston Road, Park Farm Industrial Estate, Redditch, B987SG (11 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
18.60 MW
Land North East Of East Sleekburn C415 Spine Road To East Sleekburn, Bedlington, Northumberland, NE22 7BG (8 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• NSL is a 1,400 MW subsea high-voltage direct current electricity cable under construction between Norway and the United Kingdom which will connect the Transmission Systems of Norway and Great Britain. The cable will run from Kvilldal in Norway, to Blyth in the United Kingdom. The converter station in England will be located near to the cable landfall in East Sleekburn village and it will be connected to the National Grid at the Blyth substation.
• New build power station comprised of multiple reciprocating engines.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
1218.00 MW
Land To The East Of Fire Station Green Lane Bishop Auckland DL14 6RS (7 components)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• a new build gas generating station
Active • 2025-26 (T-4), 2023-24 (T-4) ...
9.50 MW
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (10 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
31.39 MW
Land west of Cadwell Lane, Hitchin, SG4 0AG (2 components)
• 3 X 2MW gas fuelled generators installed on a compound on land to the west of Cadwell Lane
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
Inactive • 2022-23 (T-3)
LONG ACRE FARM, BIRTLEY, CHESTER LE STREET, DH3 1RQ. (Nearest postcode to grid reference: NE9 7UA). (7 components)
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
• Component has yet to be procured.
• Gas peaking reciprocating engine
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Mannelli House, Cowper Road, Gilwilly Industrial Estate, Penrith, CA11 9BN (6 components)
• 6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2024-25 (T-1), 2023-24 (T-4) ...
0.66 MW
Poole Bank Nurseries , Common Lane, Welton, Hull, HU15 1UT (18 components)
• Aggregate CMU from multiple sources
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2024-25 (T-4) ...
287.90 MW
Rannoch Power Station, Rannoch, Perthshire, PH17 2QP (49 components)
• 1 x hydro turbine & synchronous generator
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
207.87 MW
Loading map...
Showing 25 locations