Reciprocating engines

42 unique locations (321 components) - Page 1 of 2

100 Montifichet Road, Westfield, Stratford E20 1GR (60 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
843.06 MW
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (5 components)
• CMU consisting of multiple reciprocating engines and alternators (2)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2024-25 (T-4), 2023-24 (T-4) ...
9.68 MW
1-3 Loicher Lane, Ecclesfield, Sheffield, S35 9XN (5 components)

Generating unit

Active • 2025-26 (T-4)
ACS&T - Tewkesbury - Site 1, Newtown Trading Est/Green La, Tewkesbury GL20 8HD (15 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
24.18 MW
Aldon Road, Poulton-le-Fylde, Lancashire FY6 8JL (6 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
57.08 MW
Applied Automation Eastern Wood Road Langage Industrial Estate PL7 5ET (10 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
16.18 MW
Aveley (N) Sandy Lane Aveley South Ockendon Essex RM15 4XP (9 components)
• Gas fired generating unit
• The site comprises of four gas reciprocating engines with an assumed output of 4.6MW. The reciprocating engines are connected to the distribution network.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
11.53 MW
47.80 MW
Cps House, Stephenson Road, Severalls Industrial Park, Colchester, CO4 9QR (4 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2026-27 (T-4), 2025-26 (T-4) ...
10.63 MW
GREENMOOR BANK FARM, OLD HUTTON, KENDAL, LA8 0NT (3 components)
• Battery Storage Plant
• Gas peaking reciprocating engine
• Gas peaking reciprocating engines
Inactive • 2022-23 (T-4), 2021-22 (T-4)
103.90 MW
Grimethorpe CMM Generation Plant Springvale Road Grimethorpe S72 7BF (4 components)

Gas reciprocating engines

Active • 2028-29 (T-4), 2026-27 (T-4) ...
20.80 MW
Hanson Street, Middleton, Manchester, M24 2YP (8 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.84 MW
Hawarden Industrial Park Clwyd Close Manor Lane Hawarden Deeside CH5 3PZ (12 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
9.52 MW
Knypersley Generation Unit G, Brown Lees Industrial Estate, Knypersley, Staffordshire, ST8 7DN (8 components)
• The CMU Component is made up of brand new gas-fired engines.
• The CMU Component is made up of reciprocating diesel engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land adjacent to Netherlands Way / Europa Way Stallingborough Grimsby DN41 8DT (6 components)
• 10 x 2MW gas reciprocating engines
• 10x 2MW Gas Reciprocating Engines
Inactive • 2023-24 (T-4), 2022-23 (T-3)
56.99 MW
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (6 components)
• A New Build Battery Energy Storage System
• A New Build Gas fuelled power plant at Capenhurst substation
Active • 2025-26 (T-4), 2024-25 (T-4) ...
129.72 MW
Land at Hound Farm, Hound Road, Netley, Southampton, SO31 5FS (11 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2027-28 (T-4), 2026-27 (T-4) ...
17.10 MW
Land at Kilbuck Lane, Haydock Cross Industrial Estate, St. Helens, WA11 9SR (3 components)

A new build gas fuelled generating plant at Haydock Cross Industrial Estate, WA11 9SR

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
38.02 MW
LAND AT L C P AUTOSURE BRIDGE ROAD ASHFORD TN23 1BB (10 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-4) ...
149.26 MW
Land at Woolaston Road, Park Farm Industrial Estate, Redditch, B987SG (12 components)
• New reciprocating gensets in acoustic enclosure
• Reciprocating genset
Active • 2026-27 (T-4), 2023-24 (T-4) ...
11.08 MW
Land off High View Road, South Normanton, Bolsover, Derbyshire, DE55 2EY (12 components)

Reciprocating genset

Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.31 MW
Land off Kibworth Road, Moss Farm, Kibworth Beauchamp, Leicester, LE8 0HJ (6 components)
• 2.5MW gas fired peaking power plant
• 5MW gas fired peaking power plant
• Containerised Reciprocating Gas Engines
Active • 2026-27 (T-4), 2025-26 (T-4) ...
14.38 MW
Loading map...
Showing 25 locations