Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

19 unique locations (159 components)

53 Valley Road Plymouth PL7 1RF (8 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• To be confirmed once CMU components are known
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
4.75 MW
A65, Kirby Lonsdale, Carnforth, LA6 2HH (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• To be confirmed once CMU components are known
Inactive • 2022-23 (T-3)
Campus Data Centre, Spring Way, Hemel Hempstead, Herts, HP2 7SU (2 components)
• DSR component offering flexibility delivered by load turn down at a data centre
• New build power station comprised of multiple reciprocating engines.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Currock Road, Carlisle, Cumbria CA2 5AD (5 components)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-3)
19.00 MW
Devons Road, Bromley by Bow, London, E3 3BF (14 components)
• A gas fuelled generating station.
• A reciprocating gas engine CHP site providing hot water to a local district heating network.
Inactive • 2022-23 (T-3), 2018-19 (T-1) ...
0.78 MW
Hamilton Road, Sutton-in-Ashfield, NG17 5ES (9 components)
• A 7MW new build gas fuelled generating station.
• A new build gas fuelled generating station.
• To be confirmed once CMU components are known
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
3.80 MW
Hawthorne Road, Bootle, Merseyside, L20 5AG. (4 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• DSR Component providing load turn down at a data centre
• The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Heathfield Landfill, John Acres Lane, Kingsteignton, Devon, TQ12 3GP (3 components)
• DSR Component providing load turn down at a data centre
• OCGT from Grain U4. Fuel is Gas Oil as specified in BS 2869 Class A2
• The CMU at the Heathfield Landfill site in Devon will be made up of three reciprocating engines generating from natural gas. In their current state, these engines have been designed to generate from landfill gas, but will be converted to natural gas and then recommissioned, ahead of the delivery year. The three components of the CMU (referenced VIR074, VIR079 and VIR080) are Cummins QSV91 units, built in 2008 and rated at 1,750kW. Each engine generates at 415V, which is then stepped up to 11kV and then to 33kV for export.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land at Jarrow Slake Port of Tyne Adjacent to Jarrow Road SOUTH SHIELDS NE34 9PS (4 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• DSR Component providing load turn down at a retail store
• Furnaces
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
LAND AT NORTH OF HOMEFIELD ROAD ST EDMUNDSBURY CB9 8QU (5 components)
• CMU consisting of multiple reciprocating engines and alternators
• To be confirmed once CMU components are known
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
3.85 MW
Land off Orwell Street, Grimsby, DN31 3HF (3 components)
• New reciprocating gensets in acoustic enclosure
• To be confirmed once CMU components are known
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land on the south east side of Rycote Lane, Milton Common, Thame,  OX9 2PB (11 components)
• Battery Energy Storage System
• Gas peaking reciprocating engine
• Little Barford 1 OCGT . fuel type is distillate
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Multi-Tech Engineering (UK) Ltd, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire, WF11 8RD (4 components)
• A 20MW new build gas generating station..
• DSR Component providing load turn down at a retail store
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
N Circular Rd, Walthamstow, London E4, UK, E4 8TA (2 components)
• A generating station consisting of multiple reciprocating engines and alternators located on a single site.
• To be confirmed once CMU components are known
Inactive • 2022-23 (T-4), 2022-23 (T-3)
On land off Nairn Road, Deans Industrial Estate, Livingston, EH54 8AY (6 components)
• A new build, gas fuelled generation station.
• Load reduction on site supported by non-exporting standby generation.
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Port Talbot, Port Talbot Works, SA13 2NG (15 components)
• Site based CHP ( reclassified from reciprocating engine for EMR purposes given definitions in Capacity Market Auction Guidelines )
• Site based CHP - note the primary fuel are Waste Gases
• Site based auto-generation unit ( classified as reciprocating engine for EMR purposes given a Rule Change in 2018 )
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
57.23 MW
Red Roofs Nursery Limited, North Moor Lane, Cottingham, Hull, HU16 4JN (5 components)
• A gas engine CHP site providing hot water to agricultural greenhouses
• New build power station comprised of multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Southbrook Farm, Sudbrook, Caldicot, NP26 5SR (5 components)
• 10 x 2MW gas generator units to be installed on designated land within Southbrook Farm
• A gas CHP supplying a manufacturing facility
• A gas fuelled generating station.
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
T&L Sugars Limited, Thames Refinery, Factory Road, Silvertown, London, United Kingdom, E16 2EW (51 components)
• A new build, gas fuelled generation station.
• No2 Steam turbine - Allen Steam Turbines/NG Model MB510 - 2009 - Nominal power rating 14500kWe
• No5 Gas Turbine - European Gas Turbines SGT200 'Tornado' - S765/01 1997 - Nominal power output 6000kWe
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
52.83 MW
Loading map...
Showing 19 locations