Reciprocating engines

13 unique locations (145 components)

Unit A, The Loddon Centre, Basingstoke, RG24 8QW (21 components)
• Gas reciprocating engine
• Peak power plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
30.00 MW
Southbrook Farm, Sudbrook, Caldicot, NP26 5SR (3 components)

10 x 2MW gas generator units to be installed on designated land within Southbrook Farm

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Plot A Land at Severn Road Avonmouth BS10 7SE (4 components)
• 10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Avonmouth Energy Park
• Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear
Active • 2024-25 (T-4), 2023-24 (T-4)
19.04 MW
Lubenham Road, Market Harborough, Leicestershire, LE16 9NP *Post code and grid reference may not match because site address is not yet registered with post office. We have used nearest available post code. (6 components)
• New reciprocating genset in acoustic enclosure
• New containerised battery storage equipment
• New reciprocating genset in acoustic enclosure
Inactive • 2022-23 (T-4), 2018-19 (T-1)
Land to the east side of Brunel Road, Manor Trading Estate, Benfleet, Essex, SS7 4PS (11 components)

14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land off Main Road, Weston, CW2 5LD (4 components)
• 20 MWs of multiple reciprocating generator units to be installed on designated land off main Road, Weston.
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
• 20 MWs of reciprocating engine generation connecting into existing 33kv substation
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land lying to the north west of Staithes Road, Hull, HU12 8DX (10 components)
• 21 MW power plant comprising 11 gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 21MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
38.89 MW
Griffiths Crossing Industrial Estate Caernarfon LL55 1TS (7 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (44 components)
• The CMU component is a combined cycle gas turbine
• This CMU (CARRI3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
• This CMU (CGTN_3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3471.17 MW
Bradford Road Batley Kirklees WF17 6JS (21 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 20MW of containerised, gas-fired generation together with transformers, switchgear and associated control gear
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Aveley Landfill Site, Sandy Lane, Aveley, RM15 4XP (5 components)

Gas reciprocating engines

Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.62 MW
Ashton Old Road, Openshaw, Manchester M11 1AA (7 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
68.54 MW