XPO - Southampton, Goodward Road, Eastleigh, SO50 4NT (12 components)
• Energy facility comprising of reciprocating engine sets.
• Gas fired reciprocating engines.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
11.96 MW
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (24 components)
• 2MW gas CHP engine in a horticultural environment
• One 1.354 MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
9.85 MW
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (30 components)
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2330.50 MW
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (12 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Gas Fired Reciprocating engines
• Peak power plant
Active • 2028-29 (T-4), 2024-25 (T-4) ...
44.21 MW
Water Orton, Birmingham, B46 1NU (2 components)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4)
Unit F Prestige House Cornford Road Blackpool FY4 4QQ (5 components)
• Gas Fired Reciprocating engines
• New build gas generator
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Titanium Road, Waunarlwydd, Swansea, SA5 4SG (9 components)
• Gas fired reciprocating engines
• Gas fired reciprocating engines.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Tir John North Rd, Swansea, SA1 8NS (1 component)

Gas fired reciprocating engines.

Inactive • 2023-24 (T-4)
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (48 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
32.05 MW
SPROUGHTON-RIVER INTAKE WA, SPROUGHTON, IP1 5AQ (5 components)
• Gas fired reciprocating engines.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
SIMEC Lochaber Power Lochaber Smelter North Road Fort William PH336TH (65 components)
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 3 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 4 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
443.26 MW
Royal South Hants Hospital, Graham Road, Southampton, Hampshire, SO14 0YG (23 components)
• 0.725MW Combined Heat and Power Plant Royal South Hants Hospital
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2025-26 (T-4), 2024-25 (T-4) ...
47.83 MW
Plot A, Dorehouse Industrial Estate, Sheffield , S13 9LU, UK (Please refer to 'Aire RE_Reliance Energy Supporting Letter' which is attached to the distribution connection agreement .zip file to further clarify CMU address) (3 components)
• A gas fuelled generating station.
• The CMU Component is made up of new gas-fired engines.
• gas fired reciprocating engines
Inactive • 2022-23 (T-3), 2020-21 (T-4)
Plot 4, South Kirkby Business Park, Hemsworth, WF9 3TJ (7 components)
• A 8MW New Build gas fuelled generating station.
• Gas fired reciprocating engines.
• Generating Unit 2
Active • 2026-27 (T-4), 2023-24 (T-4) ...
20.96 MW
Pilsworth North, Moss Hall Road, Pilsworth, Bury, Lancashire, BL9 7JL (4 components)
• 1 x hydro turbine & synchronous generator
• Gas fired reciprocating engines.
• The CMU at the Pilsworth North Landfill site near Bury will be made up of four reciprocating engines generating from natural gas. In their current state, these engines have been designed to generate from Anaerobic Digestion (AD) biogas, but will be converted to natural gas and then recommissioned, ahead of the delivery year. The four components of the CMU (referenced VIR097, VIR098, VIR099 and VIR100) are MWM 2020 V12 units (VIR 097 is a MWM 2020 V16), built in 2011 and rated at 1,200kW (VIR097 is rated at 1,560kW). Each engine generates at 415V, which is then stepped up to 6.6kV for export.
Active • 2026-27 (T-4), 2023-24 (T-4) ...
17.00 MW
North Rd, St Thomas, SA1 8NZ (2 components)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4)
Muntons, Flamborough Maltings, Bridlington, East Yorkshire, YO15 1DY, UK. (24 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines
• Gas fired reciprocating engines.
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
13.03 MW
Meol Cop Centre, Meols Cop Rd, Southport PR9 7RG (2 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Gas Fired Reciprocating engines
Inactive • 2023-24 (T-4), 2020-21 (T-4)
Manchester, Bolton & Bury Canal Towpath, Clifton, Manchester M27 8LR (7 components)
• Gas fired reciprocating engines.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• gas fired reciprocating engines
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
M65, Accrington BB5 5WE (8 components)
• Gas fired reciprocating engines.
• gas fired reciprocating engines
Active • 2024-25 (T-1), 2020-21 (T-4) ...
19.60 MW
Liverton Business Park Exmouth, Devon, EX8 2NU (2 components)
• A gas fuelled generating station.
• Reciprocating engines
Inactive • 2022-23 (T-3), 2020-21 (T-4)
Little Barford Power Station Little Barford St Neots PE19 6YT (32 components)
• 49.9MW Lithium Ion Batteries and power conversion system installed in a compound at Chickerell Substation.
• Little Barford 1 CCGT MSID: 4052
• Little Barford 1 OCGT . fuel type is distillate MSID: 4052
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3881.97 MW
Land to the north of A1079, Cottingham, HU17 0RP See attached location note (2 components)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Gas fired reciprocating engines.
Inactive • 2023-24 (T-4), 2021-22 (T-4)
Land to the north of A1079, Cottingham, HU17 0RP (4 components)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4)
Land lying to the north of Salisbury Road Ringwood BH24 1AL (2 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• Reciprocating Engines