Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

7 unique locations (133 components)

Waterswallows Lane, Buxton, SK17 7HP (1 component)

Energy facility comprising of reciprocating engine sets.

Active • 2024-25 (T-4)
16.00 MW
Waterswallows Lane, Buxton, Derbyshire SK17 7JD (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2022-23 (T-4) ...
Plot B Land at Waterswallows Road, Buxton, SK17 7JT (2 components)
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• Component has yet to be procured.
Active • 2024-25 (T-4), 2023-24 (T-4)
Plot A Land at Waterswallows Road, Buxton, SK17 7JT (4 components)
• 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
Active • 2024-25 (T-4)
16.00 MW
Manchester Rd, Carrington, Manchester M31 4TG (32 components)
• 2 x 2.5 MW gas fuelled generators installed on land east of Griffiths Road.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 MW.
Active • 2026-27 (T-4), 2024-25 (T-1) ...
12.59 MW
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (75 components)
• CMU consisting of multiple gas reciprocating engines and alternators
• Energy facility comprising of reciprocating engine sets.
• TBC
Active • 2026-27 (T-4), 2024-25 (T-4) ...
7.28 MW
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (15 components)
• 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• A completed power plant, with associated civil works, switchgear and electrical connection.
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
7.90 MW
Loading map...
Showing 7 locations