Reciprocating engines

75 unique locations (830 components) - Page 1 of 3

530 London Road Thornton Heath London CR7 7YE (5 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Hospital
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
A65, Kirby Lonsdale, Carnforth, LA6 2HH (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• To be confirmed once CMU components are known
Inactive • 2022-23 (T-3)
A89, Deans, West Lothian, Scotland, EH54 8TB, United Kingdom (1 component)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-3)
Asda Didcot, Harrier Park, Hawksworth, Didcot, Oxfordshire, OX11 7PL (25 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 MW grid connection size, in line with rule 3.5.3 using historic data. Mercia Waste Management Ltd 250kT Energy from Waste plant with c. 19MW electrical output net. Auxilliary load is not included in connection capacity .i.e the export is net.
• load curtailment at site
Active • 2028-29 (T-4), 2026-27 (T-4) ...
11.07 MW
Asda Sheffield Drakehouse, Joan Ln, Bamford, Hope Valley S33 0AW (7 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Load reduction on site supported by non-exporting standby generation.
• Sizewell B Power Station CMU 1: [SZ1-20] T_SIZB-1 + (50% x T_SIZB-D)
Active • 2027-28 (T-4), 2024-25 (T-4) ...
7.43 MW
Aspatria Business Park, Park Road, Aspatria, Cumbria, CA7 3DP (2 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• New build power station comprised of multiple reciprocating engines
Inactive • 2022-23 (T-3), 2021-22 (T-4)
Bison Place, Leyland, PR26 7QR (1 component)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-3)
Blauegate Works, Stanley Way, Lathom, Skelmersdale, WN8 8EA (11 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• The facility consists of a series of gas fired generators. It connects to SPEN's network at 33kV.
• Total installed capacity is 6.6MW of gas reciprocating engines to be installed on designated land within a manufacturing compound at Blauegate Works.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
6.27 MW
Bourton, Buckingham, MK18 7DU (2 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• N/A
Inactive • 2022-23 (T-4), 2022-23 (T-3)
Browney Lane, Meadowfield , DH7 8XR (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
7.18 MW
Burntstump Landfill Site, Ollerton Road, Arnold, Nottinghamshire, NG5 8PR (1 component)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-3)
Calvert Landfill Site, Creighton Road, Woodham, Buckinghamshire, HP18 0QW (1 component)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2023-24 (T-4)
Cheshire Power Station North Road Ellesmere Port Cheshire CH65 1AF (5 components)
• A 20MW New Build gas fuelled generating station.
• CMU will be formed of multiple individual reciprocating gas engines.
• Unit 1 Cruachan pumped storage hydro plant
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
38.07 MW
Clay Wheels Lane, Sheffield, S6 1LZ (3 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
5.22 MW
Clifton Street, Miles Platting, M40 8HF (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
7.60 MW
Club Farm, Pimlico Link Road, Clitheroe BB7 1QW (2 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines
• A new power plant, with associated civil works, switchgear and electrical connection.
Inactive • 2022-23 (T-4), 2020-21 (T-4)
Cotton Valley STW, Portway, Milton Keynes, MK15 9LZ (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines

Inactive • 2022-23 (T-4)
Currock Trade Centre, Currock, Carlisle, Cumberland, England, CA2 5AD (2 components)

A Distribution Connected gas fueled generating station.

Active • 2028-29 (T-4)
14.96 MW
Dig Gate Lane, Lady House, Milnrow, Rochdale, Greater Manchester, England, OL16 4NR (2 components)
• A Distribution Connected Battery Energy Storage System.
• A Distribution Connected gas fueled generating station.
Active • 2028-29 (T-4)
10.40 MW
EDF Energy, Heysham 1 power station, Morecambe, Lancashire, LA3 2XH (33 components)
• EV charge station
• Heysham 1 Power Station CMU 1: [HY1124] T_HEYM11
• Heysham 1 Power Station CMU 2: [HY1224] T_HEYM12
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2591.79 MW
Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (47 components)
• TG1B is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which TG1B is the larger. This Generating Unit is embedded in the 'E_FAWND' BMU and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of 'EMD-19' are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power generation units on the site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (part of MSID 7095). Both Unit 3 and TG1B units share various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested. To clarify the 3 units within the refinery boundary, they are Unit 5 (EMG-19) and TG1B and Unit 3 (which make up EMD-19). Gross 3 HH av. peak generation from TG1B on separate days = 49.863 MW At these three HH times, aux load on TG1B = -1.468 MW Net generation from TG1B = 48.394 MW
• TG1B is part of the aggregated CMU EMD244, which is made up of 2 Generating Units of which TG1B is the larger. This Generating Unit is embedded in the 'E_FAWND' BMU and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of 'EMD244' are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power generation units on the site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (part of MSID 7095). Both Unit 3 and TG1B units share various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested.
• Unit 3 is part of the aggregated CMU EMD244, which is made up of 2 Generating Units of which Unit 3 is the smallest. This Generating Unit is embedded in the ?E_FAWND? BMU and is part of the larger site inclusive BM Trading Unit, ?EPCO1?. All Components of ?EMD244? are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 3 is one of three power generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). Both units share various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to Unit 3 and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
774.43 MW
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (166 components)
• GT3
• Genset 1.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
13899.76 MW
Furness Vale Industrial Estate, Station Road, Furness Vale, SK23 7SW (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Galhampton Hill, Pitcombe, BA7 7NJ (1 component)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-3)
Gallowber Lane, Kirby Lonsdale, Carnforth, LA6 2HH (1 component)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2023-24 (T-4)