Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

14 unique locations (99 components)

Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (3 components)
• Gas reciprocating engines (2)
• The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
2.52 MW
3.07 MW
Askern CMM Generation Campsall Road Askern Doncaster DN6 0FD (2 components)

Gas reciprocating engines

Active • 2025-26 (T-4), 2024-25 (T-1)
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (5 components)
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
• Gas fired generating units
• Gas reciprocating engines
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
0.93 MW
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (17 components)
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
• Gas fired generating units
• Gas reciprocating engines
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.78 MW
Aveley Landfill Site, Sandy Lane, Aveley, RM15 4XP (5 components)

Gas reciprocating engines

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.68 MW
Bevercotes 1 Energy Park, West Drayton Avenue, Bevercotes, Nottinghamshire, DN22 8DB (5 components)
• 1x 1.35MW Containerised Generating sets.
• Gas reciprocating engines
Inactive • 2020-21 (T-1), 2019-20 (T-1) ...
Bevercotes 1 Energy Park, West Drayton Avenue, Bevercotes, Nottinghamshire, DN22 8DB (15 components)
• 1x 1.35MW Containerised Generating sets.
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
1.07 MW
Bevercotes Energy Park West Drayton Avenue Bevercotes Nottinghamshire DN22 8DB (2 components)

Gas reciprocating engines

Active • 2025-26 (T-4), 2024-25 (T-1)
Bilsthorpe Colliery Site Bilsthorpe Newark Notts NG22 8ST (1 component)

Gas reciprocating engines

Inactive • 2019-20 (T-1)
Bilsthorpe Colliery Site Bilsthorpe Newark Notts NG22 8ST (3 components)

Gas reciprocating engines

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Dogsthorpe Landfill Site Welland Road Peterborough Cambridgeshire PE1 3TD (8 components)
• 2 gas reciprocating engines with a combined export output of approximately 2MW. The generating equipment is connected to the distribution network via an import/export meter.
• Gas reciprocating engines
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11.44 MW
Shirebrook 1 Acreage Lane Shirebrook Nottinghamshire NG20 8RN (16 components)
• Gas reciprocating engines. (4)
• Gas reciprocating engines
Active • 2028-29 (T-4), 2026-27 (T-4) ...
13.75 MW
Loading map...
Showing 14 locations