Reciprocating engines

15 unique locations (122 components)

Bones lane, Cheddleton, Leek, Staffordshire, ST13 7BT (8 components)

1.9 MW Gas gen ENER-G 1999

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (14 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.36 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (12 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.39 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (13 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.36 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (13 components)

1 * 1.7MW diesel reciprocating engine

Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.36 MW
Felindre Rd, Pencoed, Bridgend, CF35 5HU (2 components)

A new build, gas fuelled generation station

Active • 2026-27 (T-4)
38.07 MW
Felindre Road, Pencoed, Brigend, CF35 5HU (1 component)

New build 40MW gas Peaker plant

Active • 2025-26 (T-1)
37.21 MW
Forth Drove, Peterborough PE1 5NT (7 components)

A Prospective New Build Gas reciprocating energy reserve facility

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Howard Road, Park Farm Industrial Estate, Redditch B98 7SE (1 component)

Redditch 20MW Gas Peaker

Active • 2025-26 (T-1)
18.51 MW
Howard Road, Park Farm Industrial Estate, Redditch, B98 7SE (6 components)

Redditch 20MW Gas Peaker Project

Active • 2026-27 (T-4), 2024-25 (T-1) ...
56.54 MW
North Avenue, Marston Green, Birmingham, B40 1NT (20 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Gas Generation units at 1013kWe
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
• ... and 1 more unique description
Active • 2024-25 (T-4), 2023-24 (T-4) ...
North Avenue, Marston Green, Birmingham, B40 1NT. (10 components)

Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Rampside Road, Roosecote, Near Barrow-in-Furness, Cumbria LA13 0PQ (3 components)

A Prospective New Build Gas reciprocating energy reserve facility

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Scawby Brook, Brigg, Lincolnshire DN20 9LT (9 components)
• A Prospective New Build Gas reciprocating energy reserve facility
• Gas reciprocating energy reserve facility
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Scawby Brook, Scawby, Brigg, DN20 9LT. (3 components)

Brigg Gas Peaker

Active • 2026-27 (T-4), 2025-26 (T-1) ...
90.56 MW