Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

130 unique locations (1827 components) - Page 1 of 6

1020 Slutchers Lane, Centre Park, Warrington, WA1 1QL (9 components)
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network. (2)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
44.72 MW
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (33 components)
• Operational gas reciprocating engine. (2)
• Operational Reciprocating Engine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.64 MW
4 Chemistry Lane, Pentre, Deeside CH5 2DA, UK (1 component)

14MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Active • 2028-29 (T-4)
12.86 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (19 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
37.74 MW
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (16 components)

One Jenbacher CHP engine with a generation capacity of 3.36 MW (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.31 MW
Ash Road, Elton, Chester, CH2 4RX (3 components)

A new build, gas fuelled generation station.

Active • 2028-29 (T-4)
46.28 MW
Aveley Landfill Site, Sandy Lane, Aveley, RM15 4XP (5 components)

Gas reciprocating engines (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.68 MW
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (11 components)

A completed power plant, with associated civil works, switchgear and electrical connection. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.63 MW
Batleys Cash and Carry Talbot Road Fareham PO15 5RY (11 components)
• The CMU component is net of the auxiliary power required (2)
• A completed power plant, with associated civil works, switchgear and electrical connection.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
52.31 MW
Bond Avenue Bletchley Milton Keynes MK1 1JJ (19 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.79 MW
Bond Avenue Bletchley Milton Keynes MK1 1JJ (18 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
16.88 MW
Booker Cash and Carry Frobisher Way Hatfield Hertfordshire AL10 9TR (12 components)

A completed power plant, with associated civil works, switchgear and electrical connection. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.67 MW
Booth Lane, Sandbach, Cheshire CW11 3PY (1 component)

A gas fueled distribution connected generating station

Active • 2028-29 (T-4)
23.37 MW
Brentfield Road Willesden London NW10 8JP (24 components)
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Diesel as specified in BS EN590 (2)
• Taylor's Lane OCGT GT Unit 3 Unit fuelled by Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
395.55 MW
Brentfield Road Willesden London NW10 8JP (22 components)
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Diesel as specified in BS EN590 (2)
• Taylor's Lane OCGT GT Unit 3 Unit fuelled by Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
395.55 MW
Cavendish Rd Stevenage SG1 2ET UK (17 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.64 MW
Cavendish Rd Stevenage SG1 2ET UK (15 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.64 MW
Cavendish Road 33kV Generation, Land Behind Caswell House, Cavendish Road, Stevenage, SG1 2ET (13 components)
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW. (2)
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
16.97 MW
Chamberhall Street, Bury, Lancashire, BL9 0LU (5 components)

20MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
55.19 MW
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (33 components)
• Killingholme Module 1 converted to open cycle operation (2)
• Killingholme Module 2 converted to open cycle operation
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1775.69 MW
Loading map...
Showing 25 locations