Reciprocating engines

24 unique locations (645 components)

2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (35 components)
• EV charging at residential premises
• Operational Reciprocating Engine
• Operational gas reciprocating engine.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.10 MW
ABP Doncaster, Westmoor Park, Lincolnshire Way, Armthorpe, Doncaster DN3 3FF (25 components)
• 10 gas reciprocating engines used for power generation, with associated infrastructure.
• Component has yet to be procured.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
29.11 MW
Cassley Power Station, By Overscaig, Lairg, Sutherland, IV27 4NY (2 components)
• A gas fuelled generating station.
• Hydro Generation Units 1 & 2
Active • 2028-29 (T-4), 2023-24 (T-4)
10.01 MW
Connah's Quay 400 kV Substation, Kelsterton Lane, Connah?s Quay, Flintshire, North Wales, CH5 4BP (15 components)
• 10 gas reciprocating engines used for power generation, with associated infrastructure.
• A new build 49.5MW battery energy storage system
• The East West Interconnector (EWIC) is a 400kV HVDC link between Connah's Quay in Wales and Woodland in Ireland.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
544.85 MW
Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU (37 components)
• 2mW 2.3MWH Battery Energy Storage System
• Didcot B5 - CCGT MSID: 4055
• Didcot B6 - CCGT MSID: 4055
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3355.13 MW
Drayton Garden Village CHP, Porters Way, Hillingdon, Greater London, UB7 9AA (15 components)
• A gas engine CHP site providing hot water to a local district heating network
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Pembroke 11 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.71 MW
EDF Energy, Heysham 2 power station, Morecambe, Lancashire, LA3 2XH (43 components)
• Heysham 2 Power Station CMU 7: [HY2723] T_HEYM27 + (50% x T_HEYM2-D)
• Heysham 2 Power Station CMU 7: [HY2724] T_HEYM27 + (50% x T_HEYM2-D)
• Heysham 2 Power Station CMU 8: [HY2824] T_HEYM28 + (50% x T_HEYM2-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3985.39 MW
EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU (34 components)
• Torness Power Station CMU 1: [TN1-23] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 1: [TN1-24] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 2: [TN2-24] T_TORN-2 + (50% x T_TORN-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3068.68 MW
Foyers Power Station, Foyers, Inverness, IV2 6YB (16 components)
• Construction of a New Generating CMU comprising of gas fuelled reciprocating generation sets and gas delivery plant
• Generating Unit 1
• Generating Unit 2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
603.34 MW
Gaur Power Station, Killiechonan, Bridge of Gaur, Perthshire, PH17 2QB (2 components)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Hydro Generation Unit
Active • 2028-29 (T-4), 2022-23 (T-4)
6.83 MW
Hem Heath Sir Stanley Matthews Way Trentham Lakes Trentham Stoke on Trent ST4 8GR (5 components)
• Gas reciprocating engines
• N/A
• New Build Generating CMU comprising of a battery storage asset
Active • 2028-29 (T-4), 2022-23 (T-4) ...
3.54 MW
Inverawe Power Station, Inverawe, by Taynuilt, Argyll, PA35 1HU (24 components)
• 1 x hydro turbine & synchronous generator
• 1x hydro turbine & synchronous generator
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
91.46 MW
Kirklees Energy from Waste Plant Vine Street Huddersfield, Yorkshire HD1 6NT (29 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Existing Energy from Waste Plant
• The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
56.00 MW
Land Adjacent to Stobarts Logistics Off Branthwaite Road Lillyhall Workington Cumbria CA14 4ED (16 components)
• Gas reciprocating engines
• Generating Unit 2
• The East West Interconnector (EWIC) is a 400kV HVDC link between Connah's Quay in Wales and Woodland in Ireland.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.75 MW
Medway Power Station, Rochester, Medway, ME3 0AG (29 components)
• A gas fuelled generating station.
• Genset 3
• Medway CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6669.90 MW
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (45 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a combined cycle gas turbine
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2527.80 MW
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (27 components)
• A gas fuelled generating station.
• Generators at hospital site
• Peterhead CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6471.35 MW
Rannoch Power Station, Rannoch, Perthshire, PH17 2QP (49 components)
• 1 x hydro turbine & synchronous generator
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
207.87 MW
Saltend Lane, HULL, HU12 8PP (33 components)
• Load reduction
• Load reduction on site
• On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
Active • 2028-29 (T-4), 2025-26 (T-4) ...
14.86 MW
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (12 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.
• Didcot B6 - CCGT MSID: 4055
Active • 2028-29 (T-4), 2027-28 (T-4) ...
762.63 MW
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (60 components)
• Staythorpe 1 - CCGT MSID: 7210
• Staythorpe 2 - CCGT MSID: 7210
• Staythorpe 4 - CCGT MSID: 7210
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6050.24 MW
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (18 components)
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• Genset 1. ROCable hydro units within the BMU are not included in the CMU.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
20.07 MW
Traston Road, Off Corporation Road, Newport , Gwent, NP19 4RQ (27 components)
• Generating Unit 1
• ROCable hydro units within the BMU are not included in the CMU.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
49.17 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (47 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
232.80 MW
Loading map...
Showing 24 locations