160 unique locations (2175 components) - Page 1 of 7

1020 Slutchers Lane, Centre Park, Warrington, WA1 1QL (9 components)
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network. (2)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
44.72 MW
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (16 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.48 MW
1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD (4 components)
• AN 8MW new build gas generating station..
• CMU FES002 which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity …
• CMU FES26B which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity …
Active • 2026-27 (T-4), 2024-25 (T-4)
7.14 MW
1 Maxwell Road, Woodston Industrial Estate, Peterborough PE2 7JB (5 components)
• This CMU is 10*2MW reciprocating engines using HVO.
• This CMU is 10*2MW reciprocating engines.
• This CMU is 6*2MW reciprocating engines.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
18.70 MW
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (33 components)
• Operational gas reciprocating engine. (2)
• Operational Reciprocating Engine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.64 MW
3 Nairn Road, Deans Industrial Estate, Livingston, West Lothian, EH54 8AY (9 components)
• Newbuild gas generator
• Reciprocating engine (natural gas fuelled)
• gas generator
Active • 2026-27 (T-4), 2025-26 (T-1) ...
15.80 MW
4 Chemistry Ln, Pentre, Deeside CH5 2DA, UK (4 components)

14MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
26.16 MW
4 Finway Road Hemel Hempstead HP2 7PT (16 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.48 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (19 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
37.74 MW
Alne Material Recovery Facility, Forest Lane, Alne, York, YO61 1TU (9 components)
• Existing Generating CMU comprising of a gas fuelled reciprocating engine and gas delivery plant.
• Generating CMU comprising of a CHP asset producing energy from waste
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
5.66 MW
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (16 components)

One Jenbacher CHP engine with a generation capacity of 3.36 MW (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.31 MW
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (11 components)

A completed power plant, with associated civil works, switchgear and electrical connection. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.63 MW
Batleys Cash and Carry Talbot Road Fareham PO15 5RY (11 components)
• The CMU component is net of the auxiliary power required (2)
• A completed power plant, with associated civil works, switchgear and electrical connection.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
52.31 MW
Bentinck Generating Station, Mill Lane, Nottinghamshire NG17 9LG (2 components)

A 7.5MW new build gas generating station.. (2)

Active • 2026-27 (T-4), 2025-26 (T-1)
14.15 MW
Bond Avenue Bletchley Milton Keynes MK1 1JJ (19 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.79 MW
Bond Avenue Bletchley Milton Keynes MK1 1JJ (18 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
16.88 MW
Booker Cash and Carry Didcot OX11 7HJ (7 components)

A completed power plant, with associated civil works, switchgear and electrical connection. (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.14 MW
Booker Cash and Carry Frobisher Way Hatfield Hertfordshire AL10 9TR (12 components)

A completed power plant, with associated civil works, switchgear and electrical connection. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.67 MW
Booth Lane Sandbach Cheshire CW11 3PY (1 component)

A new build gas fuelled generating station.

Active • 2026-27 (T-4)
42.83 MW
Brentfield Road Willesden London NW10 8JP (24 components)
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Diesel as specified in BS EN590 (2)
• Taylor's Lane OCGT GT Unit 3 Unit fuelled by Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
395.55 MW
Brentfield Road Willesden London NW10 8JP (22 components)
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Diesel as specified in BS EN590 (2)
• Taylor's Lane OCGT GT Unit 3 Unit fuelled by Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
395.55 MW
Briar Chemicals, Sweet Briar Road, Norwich, NR6 5AP (5 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
22.78 MW
Loading map...
Showing 25 locations