Reciprocating engines

2 unique locations (19 components)

Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (13 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.96 MW
Land off Kibworth Road, Moss Farm, Kibworth Beauchamp, Leicester, LE8 0HJ (6 components)
• 2.5MW gas fired peaking power plant
• 5MW gas fired peaking power plant
• Containerised Reciprocating Gas Engines
Active • 2026-27 (T-4), 2025-26 (T-4) ...
14.38 MW
Loading map...
Showing 2 locations