Reciprocating engines

21 unique locations (748 components)

Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (47 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
232.80 MW
Tickhill Road, Rotherham, South Yorkshire, S66 7QW (12 components)
• Gas fired generating unit(s)
• Generating Unit 2
• Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd Reservoir. The plant is restricted to the quantity of water it can use as minimum water levels must be maintained in the resevoir. The plant has a connection capacity of 35300kVA and an associated power factor of 0.85.
Active • 2026-27 (T-4), 2023-24 (T-4) ...
29.74 MW
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (18 components)
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• Genset 1. ROCable hydro units within the BMU are not included in the CMU.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
20.07 MW
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (60 components)
• Staythorpe 1 - CCGT MSID: 7210
• Staythorpe 2 - CCGT MSID: 7210
• Staythorpe 4 - CCGT MSID: 7210
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6050.24 MW
Sloy Power Station, Inveruglas, By Arrochar, Argyll, G83 7DP (22 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment.
• Genset 3
• The CMU component comprises of three 2MW Reciprocating Gas Engines
Active • 2026-27 (T-4), 2024-25 (T-4) ...
7.09 MW
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (12 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.
• Didcot B6 - CCGT MSID: 4055
Active • 2028-29 (T-4), 2027-28 (T-4) ...
762.63 MW
Rannoch Power Station, Rannoch, Perthshire, PH17 2QP (49 components)
• 1 x hydro turbine & synchronous generator
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
207.87 MW
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (27 components)
• A gas fuelled generating station.
• Generators at hospital site
• Peterhead CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6471.35 MW
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (45 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a combined cycle gas turbine
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2527.80 MW
Medway Power Station, Rochester, Medway, ME3 0AG (29 components)
• A gas fuelled generating station.
• Genset 3
• Medway CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6669.90 MW
Maybrook Road, Maybrook Business Park, Minworth, Sutton Coldfield, B76 1BE (18 components)
• N/A
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
12.09 MW
41.27 MW
Kirklees Energy from Waste Plant Vine Street Huddersfield, Yorkshire HD1 6NT (29 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Existing Energy from Waste Plant
• The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
56.00 MW
Foyers Power Station, Foyers, Inverness, IV2 6YB (16 components)
• Construction of a New Generating CMU comprising of gas fuelled reciprocating generation sets and gas delivery plant
• Generating Unit 1
• Generating Unit 2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
603.34 MW
EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU (34 components)
• Torness Power Station CMU 1: [TN1-23] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 1: [TN1-24] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 2: [TN2-24] T_TORN-2 + (50% x T_TORN-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3068.68 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (142 components)
• Genset 2.
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-4 = 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2472.54 MW
EDF Energy, Hinkley Point B power station, Nr Bridgwater, Somerset, TA5 1UD (56 components)
• Hinkley Point B Power Station CMU 7: [HP7-22] T_HINB-7 + (50% x T_HINB-D)
• Hinkley Point B Power Station CMU 7: [HP7-23] T_HINB-7 + (50% x T_HINB-D)
• Hinkley Point B Power Station CMU 8: [HP8-23] T_HINB-8 + (50% x T_HINB-D)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1771.09 MW
EDF Energy, Heysham 2 power station, Morecambe, Lancashire, LA3 2XH (43 components)
• Heysham 2 Power Station CMU 7: [HY2723] T_HEYM27 + (50% x T_HEYM2-D)
• Heysham 2 Power Station CMU 7: [HY2724] T_HEYM27 + (50% x T_HEYM2-D)
• Heysham 2 Power Station CMU 8: [HY2824] T_HEYM28 + (50% x T_HEYM2-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3985.39 MW
Drayton Garden Village CHP, Porters Way, Hillingdon, Greater London, UB7 9AA (15 components)
• A gas engine CHP site providing hot water to a local district heating network
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Pembroke 11 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.71 MW
Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU (37 components)
• 2mW 2.3MWH Battery Energy Storage System
• Didcot B5 - CCGT MSID: 4055
• Didcot B6 - CCGT MSID: 4055
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3355.13 MW
ABP Doncaster, Westmoor Park, Lincolnshire Way, Armthorpe, Doncaster DN3 3FF (25 components)
• 10 gas reciprocating engines used for power generation, with associated infrastructure.
• Component has yet to be procured.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
29.11 MW
Loading map...
Showing 21 locations